concurring in part and dissenting in part.
I agree with the Court that the relevant statutory language authorizes the Environmental Protection Agency (EPA or Agency) to compare costs and benefits. Ante, at 217-223. Nonetheless the drafting history and legislative history of related provisions, Pub. L. 92-500, §§301, 304, 86 Stat. 844, 850, as amended, 33 U. S. C. §§ 1311, 1314, make clear that those who sponsored the legislation intended the law’s text to be read as restricting, though not forbidding, the use of cost-benefit comparisons. And I would apply that text accordingly.
I
Section 301 provides that, not later than 1977, effluent limitations for point sources shall require the application of “best practicable control technology,” § 301(b)(1)(A), 86 Stat. 845 (emphasis added); and that, not later than 1983 (later extended to 1989), effluent limitations for categories and classes of point sources shall require application of the “best available technology economically achievable,” § 301(b) (2)(A), ibid, (emphasis added). Section 304(b), in turn, identifies the factors that the Agency shall take into account in determining (1) “best practicable control technology” and (2) “best available technology.” 86 Stat. 851 (emphasis added).
With respect to the first, the statute provides that the factors taken into account by the Agency “shall include consideration of the total cost of application of technology in relation to the effluent reduction benefits to be achieved from such application... and such other factors as the Administrator deems appropriate.” § 304(b)(1)(B), ibid With respect to the second, the statute says that the Agency “shall take into account... the cost of achieving such effluent reduction” and “such other factors as the Administrator deems appropriate.” § 304(b)(2)(B), ibid.
In the Senate version, the Agency was to consider “the cost of achieving such effluent reduction” when determining both “best practicable” and “best available” technology. S. 2770, 92d Cong., 1st Sess., §§ 304(b)(1)(B), (b)(2)(B) (1971) (as reported from Committee). The Senate Report explains that “the technology must be available at a cost . . . which the Administrator determines to be reasonable.” S. Rep. No. 92-414, p. 52 (1971) (hereinafter S. Rep.). But it said nothing about comparing costs and benefits.
The final statute reflects a modification of the House’s language with respect to “best practicable,” and an adoption of the Senate’s language with respect to “best available” S. Conf. Rep. No. 92-1236, pp. 124-125 (1972). The final statute does not require the Agency to compare costs to benefits when determining “best available technology,” but neither does it expressly forbid such a comparison.
The strongest evidence in the legislative history supporting the respondents’ position — namely, that Congress intended to forbid comparisons of costs and benefits when determining the “best available technology” — can be found in
As this language suggests, the Act’s sponsors had reasons for minimizing the EPA’s investigation of, and reliance upon, cost-benefit comparisons. The preparation of formal cost-benefit analyses can take too much time, thereby delaying regulation. And the sponsors feared that such analyses would emphasize easily quantifiable factors over more qualitative factors (particularly environmental factors, for example, the value of preserving nonmarketable species of fish). See S. Rep., at 47. Above all, they hoped that minimizing the use of cost-benefit comparisons would force the development of cheaper control technologies; and doing so, whatever the initial inefficiencies, would eventually mean cheaper, more effective cleanup. See id., at 50-51.
Nonetheless, neither the sponsors’ language nor the underlying rationale requires the Act to be read in a way that would forbid cost-benefit comparisons. Any such total prohibition would be difficult to enforce, for every real choice requires a decisionmaker to weigh advantages against disadvantages, and disadvantages can be seen in terms of (often quantifiable) costs. Moreover, an absolute prohibition would bring about irrational results. As the respondents themselves say, it would make no sense to require plants to
Thus Senator Muskie used nuanced language, which one can read as leaving to the Agency a degree of authority to make cost-benefit comparisons in a manner that is sensitive both to the need for such comparisons and to the concerns that the law’s sponsors expressed. The relevant statement begins by listing various factors that the statute requires the Administrator to take into account when applying the phrase “practicable” to “classes and categories.” 118 Cong. Rec. 33696. It states that, when doing so, the Administrator must apply (as the statute specifies) a “balancing test between total cost and effluent reduction benefits.” Ibid. At the same time, it seeks to reduce the likelihood that the Administrator will place too much weight upon high costs by adding that the balancing test “is intended to limit the application of technology only where the additional degree of effluent reduction is wholly out of proportion to the costs of achieving” a “marginal level of reduction.” Ibid.
Senator Muskie’s statement then considers the “different test” that the statute requires the Administrator to apply when determining the “‘best available’” technology. Ibid. (emphasis added). Under that test, the Administrator “may consider a broader range of technological alternatives.” Ibid. And in determining what is “‘best available’ for a category or class, the Administrator is expected to apply the same principles involved in making the determination of ‘best practicable’ . . . except as to cost-benefit analysis.” Ibid, (emphasis added). That is, “[w]hile cost should be a factor... no balancing test will be required.” Ibid, (empha
I believe, as I said, that this language is deliberately nuanced. The statement says that where the statute uses the term “best practicable,” the statute requires comparisons of costs and benefits; but where the statute uses the term “best available,” such comparisons are not “required” Ibid, (emphasis added). Senator Muskie does not say that all efforts to compare costs and benefits are forbidden.
Moreover, the statement points out that where the statute uses the term “best available,” the Administrator “will be bound by a test of reasonableness.” Ibid, (emphasis added). It adds that the Administrator should apply this test in a way that reflects its ideal objective, moving as closely as is technologically possible to the elimination of pollution. It thereby says the Administrator should consider, i. e., take into account, how much pollution would still remain if the best available technology were to be applied everywhere— “without regard to cost.” Ibid. It does not say that the Administrator must set the standard based solely on the result of that determination. (It would be difficult to reconcile the alternative, more absolute reading of this language with the Senator’s earlier “test of reasonableness.”)
I say that one may, not that one must, read Senator Muskie’s statement this way. But to read it differently would put the Agency in conflict with the test of reasonableness by threatening to impose massive costs far in excess of any benefit. For 30 years the EPA has read the statute and its his
The EPA’s reading of the statute would seem to permit it to describe environmental benefits in non-monetized terms and to evaluate both costs and benefits in accordance with its expert judgment and scientific knowledge. The Agency can thereby avoid lengthy formal cost-benefit proceedings and futile attempts at comprehensive monetization, see 69 Fed. Reg. 41661-41662 (2004); take account of Congress’ technology-forcing objectives; and still prevent results that are absurd or unreasonable in light of extreme disparities between costs and benefits. This approach, in my view, rests upon a “reasonable interpretation” of the statute— legislative history included. Hence it is lawful. Chevron U. S. A. Inc. v. Natural Resources Defense Council, Inc., 467 U. S. 837, 844 (1984). Most of what the majority says is consistent with this view, and to that extent I agree with its opinion.
II
The eases before us, however, present an additional problem. We here consider a rule that permits variances from
I am not convinced the EPA has successfully explained the basis for the change. It has referred to the fact that existing facilities have less flexibility than new facilities with respect to installing new technologies, and it has pointed to special, energy-related impacts of regulation. 68 Fed. Reg. 13541 (2003) (proposed rule). But it has not explained why the traditional “wholly disproportionate” standard cannot do the job now, when the EPA has used that standard (for existing facilities and otherwise) with apparent success in the past. See, e. g., Central Hudson, supra.
Consequently, like the majority, I would remand these cases to the Court of Appeals. But unlike the majority I would permit that court to remand the cases to the EPA so that the EPA can either apply its traditional “wholly disproportionate” standard or provide an adequately reasoned explanation for the change.
Section 316(b) of the Clean Water Act (CWA), 33 U. S. C. § 1326(b), which governs industrial powerplant water intake
Like the Court of Appeals, I am convinced that the EPA has misinterpreted the plain text of § 316(b). Unless costs are so high that the best technology is not “available,” Congress has decided that they are outweighed by the benefits of minimizing adverse environmental impact. Section 316(b) neither expressly nor implicitly authorizes the EPA to use cost-benefit analysis when setting regulatory standards; fairly read, it prohibits such use.
I
As typically performed by the EPA, cost-benefit analysis requires the Agency to first monetize the costs and benefits of a regulation, balance the results, and then choose the regulation with the greatest net benefits. The process is particularly controversial in the environmental context in which a regulation’s financial costs are often more obvious and easier to quantify than its environmental benefits. And cost-benefit analysis often, if not always, yields a result that does not maximize environmental protection.
For instance, although the EPA estimated that water intake structures kill 3.4 billion fish and shellfish each year,
Because benefits can be more accurately monetized in some industries than in others, Congress typically decides whether it is appropriate for an agency to use cost-benefit analysis in crafting regulations. Indeed, this Court has recognized that “[w]hen Congress has intended that an agency engage in cost-benefit analysis, it has clearly indicated such intent on the face of the statute.” American Textile Mfrs.
When interpreting statutory silence in the past, we have sought guidance from a statute’s other provisions. Evidence that Congress confronted an issue in some parts of a statute, while leaving it unaddressed in others, can demonstrate that Congress meant its silence to be decisive. We concluded as much in American Trucking. In that case, the Court reviewed a claim that § 109 of the Clean Air Act (CAA), 42 U. S. C. § 7409(a) (2000 ed.), authorized the EPA to consider implementation costs in setting ambient air quality standards. We read § 109, which was silent on the matter, to prohibit Agency reliance on cost considerations. After examining other provisions in which Congress had given the Agency authority to consider costs, the Court “refused to find implicit in ambiguous sections of the CAA an authorization to consider costs that has elsewhere, and so often, been expressly granted.” 531 U. S., at 467. Studied silence, we thus concluded, can be as much a prohibition as an explicit “no.”
Further motivating the Court in American Trucking was the fact that incorporating implementation costs into the Agency’s calculus risked countermanding Congress’ decision to protect public health. The cost of implementation, we said, “is both so indirectly related to public health and so full of potential for canceling the conclusions drawn from direct health effects that it would surely have been expressly mentioned in [the text] had Congress meant it to be considered.” Id., at 469.
II
In 1972, Congress amended the CWA to strike a careful balance between the country’s energy demands and its desire to protect the environment. The Act required industry to adopt increasingly advanced technology capable of mitigating its detrimental environmental impact. Not all point sources were subject to strict rules at once. Existing plants were granted time to retrofit with the best technology while new plants were required to incorporate such technology as a matter of design. Although Congress realized that technology standards would necessarily put some firms out of business, see EPA v. National Crushed Stone Assn., 449 U. S. 64, 79 (1980), the statute’s steady march was toward stricter rules and potentially higher costs.
Section 316(b) was an integral part of the statutory scheme. The provision instructs that “[a]ny standard established pursuant to section 1311 of this title or section 1316 of this title and applicable to a point source shall require that the location, design, construction, and capacity of cooling water intake structures reflect the best technology available for minimizing adverse environmental impact.” 33 U. S. C. § 1326(b) (2006 ed.) (emphasis added).
Based largely on the observation that § 316(b)’s text offers little guidance and therefore delegates some amount of gap-filling authority to the EPA, the Court concludes that the Agency has discretion to rely on cost-benefit analysis. See ante, at 222-223. The Court assumes that, by not specifying how the EPA is to determine BTA, Congress intended to give considerable discretion to the EPA to decide how to proceed. Silence, in the majority’s view, represents ambiguity and an invitation for the Agency to decide for itself which factors should govern its regulatory approach.
The appropriate analysis requires full consideration of the CWA’s structure and legislative history to determine whether Congress contemplated cost-benefit analysis and, if so, under what circumstances it directed the EPA to utilize it. This approach reveals that Congress granted the EPA authority to use cost-benefit analysis in some contexts but not others, and that Congress intended to control, not delegate, when cost-benefit analysis should be used. See Chevron U. S. A. Inc. v. Natural Resources Defense Council, Inc., 467 U. S. 837, 842-843 (1984).
Powerful evidence of Congress’ decision not to authorize cost-benefit analysis in the BTA standard lies in the series of
The first tier of technology standards applied to existing plants — facilities for which retrofitting would be particularly costly. Congress required these plants to adopt “effluent limitations ... which shall require the application of the best practicable control technology currently available.” 33 U. S. C. § 1311(b)(1)(A). Because this “best practicable,” or “BPT,” standard was meant to ease industry’s transition to the new technology-based regime, Congress gave BPT two unique features: First, it would be temporary, remaining in effect only until July 1,1983.
The second tier of technology standards required existing powerplants to adopt the “best available technology economically achievable” to advance “the national goal of eliminating the discharge of all pollutants.” § 1311(b)(2)(A). In setting this “best available technology,” or “BAT,”
The BAT standard’s legislative history strongly supports the view that Congress purposefully withheld cost-benefit authority for this tier of regulation. See ibid., n. 10. The House of Representatives and the Senate split over the role cost-benefit analysis would pláy in the BAT provision. The House favored the tool, see H. R. Rep. No. 92-911, p. 107 (1972), 1 Leg. Hist. 794, while the Senate rejected it, see 2 id., at 1183; id., at 1132. The Senate view ultimately prevailed in the final legislation, resulting in a BAT standard that was “not subject to any test of cost in relation to effluent reduction benefits or any form of cost/benefit analysis.” 3 Legislative History of the Clean Water Act of 1977: A Continuation of the Legislative History of the Federal Water Pollution Control Act (Committee Print compiled for the
The third and strictest regulatory tier was reserved for new point sources — facilities that could incorporate technology improvements into their initial design. These new facilities were required to adopt “the best available demonstrated control technology,” or “BADT,” which Congress described as “a standard . . . which reflects] the greatest degree of effluent reduction.” § 1316(a)(1). In administering BADT, Congress directed the EPA to consider “the cost of achieving such effluent reduction.” § 1316(b)(1)(B). But because BADT was meant to be the most stringent standard of all, Congress made no mention of cost-benefit analysis. Again, the silence was intentional. The House’s version of BADT originally contained an exemption for point sources for which “the economic, social, and environmental costs bear no reasonable relationship to the economic, social, and environmental benefit to be obtained.” 1 Leg. Hist. 798. That this exemption did not appear in the final legislation demonstrates that Congress considered, and rejected, reliance on cost-benefit analysis for BADT.
It is in this light that the BTA standard regulating water intake structures must be viewed. The use of cost-benefit analysis was a critical component of the CWA’s structure and a key concern in the legislative process. We should therefore conclude that Congress intended to forbid cost-benefit analysis in one provision of the Act in which it was silent on the matter when it expressly authorized its use in another.
Accordingly, I would hold that the EPA is without authority to perform cost-benefit analysis in setting BTA stand
Ill
Because the Court unsettles the scheme Congress established, I respectfully dissent.
To produce energy, industrial powerplants withdraw billions of gallons of water daily from our Nation’s waterways. Thermoelectric powerplants alone demand 39 percent of all freshwater withdrawn nationwide. See Dept, of Energy, Addressing the Critical Link Between Fossil Energy and Water 2 (Oct. 2005), http://www.netl.doe.gov/technologies/coalpower/ewr/
EPA, Economic and Benefits Analysis for the Proposed Section 316(b) Phase II Existing Facilities Rule, p. Dl-4 (EPA-821-R-02-001, Feb. 2002), http://www.epa.gov/waterscience/316b/phase2/econbenefits.
EPA, Economic and Benefits Analysis for the Final Section 316(b) Phase II Existing Facilities Rule, p. Dl-5 (EPA-821-R-04-005, Feb. 2004), http://www.epa.gov/waterscience/316b/phase2/econbenefits/final.htm.
The two cross-referenced provisions, §§1311 and 1316, also establish “best technology” standards, the first applicable to existing point sources and the second to new facilities. The reference to these provisions in § 316(b) merely requires any rule promulgated under those provisions, when applied to a point source with a water intake structure, to incorporate § 316(b) standards.
The majority announces at the outset that the EPA’s reading of the BTA standard “governs if it is a reasonable interpretation of the statute— not necessarily the only possible interpretation, nor even the interpretation deemed most reasonable by the courts.” Ante, at 218. This observation is puzzling in light of the commonly understood practice that, as a first step, we ask “whether Congress has directly spoken to the precise question at issue.” Chevron, 467 U. S., at 842. Only later, if Congress’ intent is not clear, do we consider the reasonableness of the agency’s action. Id., at 843. Assuming ambiguity and moving to the second step reflects the Court’s reluctance to consider the possibility, which it later laments is “more complex,” ante, at 220, that Congress’ silence may have meant to foreclose cost-benefit analysis.
Congress later extended the deadline to March 31,1989.
Senator Muskie, the Senate sponsor of the legislation, described the cost-benefit analysis permitted under BPT as decidedly narrow, asserting that “[t]he balancing test between total cost and effluent reduction benefits is intended to limit the application of technology only where the additional degree of effluent reduction is wholly out of proportion to the costs of achieving such marginal level of reduction for any class or category of sources.” 1 Legislative History of the Water Pollution Control Act Amendments of 1972 (Committee Print compiled for the Senate Committee on Public Works by the Library of Congress), Ser. No. 93-1, p. 170 (1973) (hereinafter Leg. Hist.)
Although the majority calls this “BATEA,” the parties refer to the provision as “BAT,” and for simplicity, so will I.
The Court argues that, if silence in § 316(b) signals the prohibition of cost-benefit analysis, it must also foreclose the consideration of all other potentially relevant discretionary factors in setting BTA standards. Ante, at 222. This all-or-nothing reasoning rests on the deeply flawed assumption that Congress treated cost-benefit analysis as just one among many factors upon which the EPA could potentially rely to establish BTA. Yet, as explained above, the structure and legislative history of the CWA demonstrate that Congress viewed cost-benefit analysis with special skepticism and controlled its use accordingly. The Court’s assumption of
In 1977, Congress established an additional technology-based standard, commonly referred to as “best conventional pollutant control technology,” or “BCT,” to govern conventional pollutants previously covered by the BAT standard. See 33 U.S.C. § 1311(b)(2)(E). The BCT standard required the EPA to consider, among other factors, “the relationship between the costs of attaining a reduction in effluents and the effluent reduction benefits derived.” § 1314(b)(4)(B). That Congress expressly authorized cost-benefit analysis in BCT further confirms that Congress treated cost-benefit analysis as exceptional and reserved for itself the authority to decide when it would be used in the Act.
The Court attempts to cabin its holding by suggesting that a “rigorous form of cost-benefit analysis,” such as the form “prescribed under the statute’s former BPT standard,” may not be permitted for setting BTA regulations. Ante, at 223. Thus the Court has effectively instructed the Agency that it can perform a cost-benefit analysis so long as it does not resemble the kind of cost-benefit analysis Congress elsewhere authorized in the CWA. The majority’s suggested limit on the Agency’s discretion can only be read as a concession that cost-benefit analysis, as typically performed, may be inconsistent with the BTA mandate.
The “national performance standards” the EPA adopted were shaped by economic efficiency concerns at the expense of finding the technology that best minimizes adverse environmental impact. In its final rule-making, the Agency declined to require industrial plants to adopt closed-cycle cooling technology, which by recirculating cooling-water requires less water to be withdrawn and thus fewer aquatic organisms to be killed. Riverkeeper, Inc. v. EPA, 358 F. 3d 174, 182, n. 5 (CA2 2004); 69 Fed. Reg. 41601, and n. 44. This the Agency decided despite its acknowledgment that “closed-cycle, recirculating cooling systems ... can reduce mortality from impingement by up to 98 percent and entrainment by up to 98 percent.” Id., at 41601. The EPA instead permitted individual plants to resort to a “suite” of options so long as the method used reduced impingement and entrainment by the more modest amounts of 80 and 60 percent, respectively. See 40 CFR § 125.94(b) (2008). The Agency also permitted individual plants to obtain a site-specific variance from the national performance standards if they could prove (1) that compliance costs would be “significantly greater than” those the Agency considered when establishing the standards, or (2) that compliance costs “would be significantly greater than the benefits of complying with the applicable performance standards,” § 125.94(a)(5).
Thus, the Agency’s past reliance on a “wholly disproportionate” standard, a mild variant of cost-benefit analysis, is irrelevant. See ante, at 224-225 (majority opinion). Because “Congress has directly spoken to the precise question at issue,” Chevron, 467 U. S., at 842, longstanding yet impermissible agency practice cannot ripen into permissible agency practice.