Bridle Bit Ranch Co. v. Basin Electric Power Cooperative

Wyoming Supreme Court9/7/2005
View on CourtListener

AI Case Brief

Generate an AI-powered case brief with:

đź“‹Key Facts
⚖️Legal Issues
📚Court Holding
đź’ˇReasoning
🎯Significance

Estimated cost: $0.001 - $0.003 per brief

Full Opinion

HILL, Chief Justice.

[¶ 1] Employing its powers of eminent domain, the Respondent, Basin Electric Power Cooperative (Basin), sought to condemn a right-of-way through a portion of Campbell County in order to build a 230-kilovolt (kV) power transmission line. Basin asserted that the transmission line was necessary so as to provide additional electrical power to areas of Campbell County where coal bed methane (CBM) is being developed and to otherwise enhance the availability and reliability of electrical service to that area. Basin is a regional wholesale electric generation and transmission cooperative that supplies wholesale electricity to its distribution cooperatives. Powder River Energy Corporation (PRECorp) is a Wyoming non-profit corporation and is one of Basin’s distribution cooperative members. PRECorp provides electricity at retail to its customers in Northeastern Wyoming, including Campbell County.

[¶ 2] Basin was able to reach settlements with approximately 82% of the private landowners affected by the transmission line, as well as with the United States Forest Service. 1 At the time of the hearing on this stage of the condemnation action (the “taking”), Basin had not yet reached agreements with two groups of landowners, nor with The State of Wyoming, Office of State Land and Investments (State Lands), or the Bureau of Land Management (BLM). 1 Case No. 04-134 is a challenge to the district court’s order granting Basin immediate possession of the lands owned by a group of landowners to whom we will refer collectively as “the Bridle Bit Group.” Case No. 04-136 is a similar challenge to that same order by another group of landowners to whom we will refer as “the Roush Group.”

[¶ 3] By order entered on July 13, 2004, this Court granted Petitions for Writ of Review under W.R.A.P. 13, in order to address the concerns of both groups of landowners. It was necessary for the landowners to utilize W.R.A.P. 13 because of a long-standing precedent articulated by this Court that the “taking” portion of a condemnation action is not *999 an appealable order. Arp v. State Highway Commission, 567 P.2d 736, 739 (Wyo.1977).

[¶ 4] Both groups of landowners contend that Basin is a public utility as defined by Wyo. Stat. Ann. § 37-1-101 (LexisNexis 2005), and, thus, Basin was required to obtain a certificate of public convenience and necessity from the Public Service Commission (PSC) before beginning the process of locating the transmission line. They also contend that Basin: Failed to show that public interest and necessity required the project; failed to show that the project is planned and located in a manner that will be most compatible with the greatest public good and the least private injury; and failed to negotiate in good faith. It is also contended that the district court erred in granting a taking that is, in essence, perpetual.

[¶ 5] We will affirm the district court’s order in all respects.

ISSUES

[¶ 6] The Bridle Bit Group raises these issues:

A. Did the district court commit clear error in finding Basin located the transmission line in the manner most compatible with greatest public good and least private injury?
B. Did the district court err in finding that a perpetual easement for transmission lines is permitted under Wyoming law?
C. Did the district court err in finding that Basin was not a public utility as defined by Wyoming Statute § 37-1-101?

The Roush Group states these issues:

I. Whether the district court erred in finding [that Basin] met all the requirements of Wyoming’s eminent domain statutes.
a. Did [Basin] comply with the statutory requirements for a condemnation action?
b. Is [Basin] a “public utility,” and therefore, required to obtain a “certificate of public convenience and necessity” from the Public Service Commission pri- or to eondemnation[?]
II. Whether [Basin] should be granted a limited easement or an easement in perpetuity.

We glean this more complete statement of the issues from Basin’s brief:

I. Basin has complied with the statutory requirements for its condemnation action.
a) Basin has shown that the public interest and necessity require the transmission line project.
b) Basin has proved that the project is planned or located in the manner that will be the most compatible with the greatest public good and the least private injury[.]
c) Basin has made reasonable and diligent efforts to acquire property by good faith negotiation.
II. Basin is entitled to a permanent easement for its transmission line and access rights-of-way.
III. Basin [is not a public utility] and was not required to obtain a certificate of public convenience and necessity from [PSC] [before proceeding with the] condemnation action.

FACTS AND PROCEEDINGS

[¶ 7] During the winter of 2000, Basin began looking at selecting a route for an additional power transmission line in Campbell County. By letter dated December 21, 2000, Basin submitted the following inquiry to PSC:

Basin Electric Power Cooperative (Basin Electric) is currently reviewing its resources for supplying wholesale power to its member Powder River Energy Corporation (PRECORP). PRECORP has experienced a sudden and rather substantial increase in its membership load because of the development of coal bed methane in the Powder River Basin.
While Basin Electric is considering several options for power supply, the first phase of an overall program needs to move forward expeditiously so that Basin Electric can meet its power supply obligations. Our studies show that Basin Electric needs approximately 40-50 MW [megawatt] of capacity in place in the PRECORP service territory on or before May of 2002.
*1000 To meet this need, we anticipate installing up to 15 MW of combustion turbine capacity adjacent to each of the PRECORP substations located in Arvada, Barber Creek and Hartzog for a total of 45 MW. A map of the proposed locations is attached. There will be three or four combustion turbines located at each substation, depending on the size of the units ultimately selected. The estimated cost of these facilities is $36 million.
Basin Electric seeks a ruling from the Commission on whether it must obtain a Certificate of Public Convenience and Necessity under Section 37-2-204[ 2 ] of the Wyoming Statutes Annotated for the installation of these turbines.
1 Basin Electric is a participant in the Laramie River Station that is jointly owned by Basin Electric, Tri-State Generation and Transmission Association, Western Minnesota Municipal Power Agency, Heartland Consumers Power District, the City of Lincoln, Nebraska Electric System and the Wyoming Municipal Power Agency. The Commission issued Certificates of Public Convenience and Necessity for this facility on June 24, 1976. Docket Numbers: 9548 Sub 4, 9611, 9621, 9622, 9623, 9624.

[¶ 8] On January 13, 2001, the Secretary and Chief Counsel for the PSC replied:

This responds to your letter to the Chairman of the Wyoming Public Service Commission of December 21, 2000, seeking the opinion of the Commission as to whether or not Basin Electric Power Cooperative (Basin) must obtain a certificate of public convenience and necessity from the Commission for the construction of certain electric generation facilities in the Wyoming Service territory of Powder River Energy Corporation (Powder River Energy). Specifically, Basin proposes to install up to 15 MW of combustion turbine capacity adjacent to each of the Powder River Energy substations located at Arvada, Barber Creek and Hartzog. You have stated that this will entail the placement of three or four combustion turbines at each substation depending on the size of the units selected for placement. You estimate the cost of the facilities to be $36 million and state that the construction is needed to assist Powder River Energy in dealing with the substantial increase in demand caused by the development of coal bed methane in the Powder River Basin.
Additionally, you have told us that Basin will own and operate the facilities, selling the power produced by the units at wholesale to Powder River Energy under its all requirements contract with your cooperative. Powder River Energy is a member of Basin, and it will neither own nor operate the facilities.
Basin is not generally regulated by the Commission. Because the power sale is being made to Powder River Energy under your existing all requirements contract, and because the facilities will furnish power to Powder River Energy at wholesale rather than directly to the public, the Commission therefore concludes that Basin is not operating as an electric “public utility” as defined in W.S. § 37-1-101. W.S. § 37-2-105, concerning certificates of public convenience and necessity, requires certification by the Commission for the facility construction activities of a “public utility.” As a result, the Commission will not require Basin to obtain a certificate of public convenience and necessity for the described facilities. We are not of the opinion that the membership of Powder River Energy in Basin constitutes a sufficient identity of business entities to disturb this conclusion.

[¶ 9] By letter dated March 8, 2001, Basin made the following additional inquiry of the PSC:

In Ron Harper’s December letter to the Commission, he reported on Basin Electric’s plans for the construction of combustion turbine generation in the Powder River Energy Corporation (PRECorp) service territory to support the growing coal bed methane development. Your letter of January 13 noted that a Certificate of Public Convenience and Necessity was not re *1001 quired for the construction of those facilities.
The purpose of this letter is to advise the Commission of Basin Electric’s plan to construct a 230 kV transmission line to support the PRECorp area, primarily from the development of coal bed methane load growth.
Attached are three copies of a map showing the corridor for the proposed line. The 230 kV line will originate at the Teckla Substation and interconnect with the PP & L 230 kV line near the Campbell/Johnson county line. The line will be approximately 70 miles in length and cost approximately $14,000,000. We hope to have this line in service by April, 2003.
Based on your January 13, 2001 letter regarding the combustion turbines, it appears that a Certificate of Public Convenience and Necessity is not needed for this line. However, we seek the opinion of the Commission regarding the need for a Certificate.

[¶ 10] The Commission replied by letter dated March 27, 2001:

This responds to your letter to the Chairman of the Wyoming Public Service Commission of March 8, 2001, seeking the opinion of the Commission as to whether or not Basin Electric Power Cooperative (Basin) must obtain a certificate of public convenience and necessity from the Commission for the construction of a 230 kV transmission line to support the Wyoming service territory of Powder River Energy Corporation (Powder River Energy), primarily in consideration of the growth being experienced by Powder River Energy in coal bed methane-related electric loads. In your letter, you specifically state that Basin proposes to build a 230 kV electric transmission line from the Teckla substation to the PaeifiCorp 230 kV line near the Campbell/Johnson County line. You state that the line will be approximately 70 miles long, that it will cost approximately $14,000,000, and that Basin’s target in-service date is April 2003.
Additionally, you have represented to us that Basin will own and operate the facilities and use them mainly to fulfill the increased demands of Powder River Energy under its all requirements contract with Basin. Basin will not make any retail electricity sales in Wyoming through the facilities. We understand that Powder River Energy is a member of Basin, and it will neither own nor operate the facilities.
Basin is not generally regulated by the Commission. Because the facilities will be used to furnish power to Powder River Energy at wholesale rather than directly to the public, the Commission concludes that Basin is not operating as an electric “public utility” as defined in W.S. [§]37-l-101. W.S. § 37-2-205, concerning certificates of public convenience and necessity, requires certification by the Commission for the facility construction activities of a “public utility.” As a result, the Commission will not require Basin to obtain a certificate of public convenience and necessity for the described 230 kV line. We are not of the opinion that the membership of Powder River Energy in Basin constitutes a sufficient identity of business entities to disturb this conclusion.

Please note, however, that the Commission will have safety jurisdiction over the line when it is complete under W.S. § 37-2-131(b), supplemental safety jurisdiction of commission, which states that:

“(b) The commission shall have safety jurisdiction over any new or existing electrical lines used by the owner to transmit electricity which is generated by the owner for resale, and which are located upon property not exclusively controlled by the owner of the line for the purpose of enforcement of the safety requirements of the National Electrical Safety Code and those safety standards adopted by the commission. This section shall not apply to any incorporated or chartered city or town established under Wyoming law or joint powers board created under the Wyoming Joint Powers Act.”

This does not change our opinion that no certificate of public convenience and necessity is required for the facility because W.S. § 37-2-131(b) applies to “owners” and not to “public utilities.”

*1002 [¶ 11] During 2001, Basin began the process of obtaining easements from landowners and public entities. As a part of this process, Basin had a consultant prepare an environmental assessment as required by the U.S. Forest Service and a 25-year, renewable easement was obtained from that federal agency in 2003. The record is unclear as to what, if any, compensation was paid for that easement, although it appears that the only cost associated with that easement is an application fee. The easement may be renewed. Basin was able to obtain easements from about 82% of the affected landowners, but had not as yet obtained firm commitments for easements from State Lands or the BLM. With respect to State Lands, an application for an easement had been submitted, but such an easement is not acted upon until the applicant for the easement has obtained access from all necessary private landowners. When such easements are approved by State Lands, they are generally for a period of 35 years, but may be for longer periods of time, including perpetuity. With respect to the BLM, Basin had been offered a 30-year easement that could be renewed and that easement could be for as long as 50 years. The BLM does not require the payment of compensation for the easement, nor is there a fee for the renewal process.

[¶ 12] On January 30, 2004, Basin filed a complaint for condemnation seeking to take the lands of those private landowners who had not yet settled with Basin. The initial determination as to whether a party seeking to condemn land may “take” the land in question is tried to the district court without a jury. W.R.C.P. 71.1. The district court set this matter for hearing on May 4-5, 2004. On June 9, 2004, the district court issued its Findings of Fact, Conclusions of Law and Order Authorizing Taking:

THE COURT makes the following findings and conclusions upon consideration of the evidence presented at trial and the submission of counsel.
1.[Basin] is a non-profit, member owned, regional generation and transmission cooperative headquartered in Bismarck, North Dakota,
2. It generates and transmits exclusively wholesale electricity to one hundred and twenty-four non-profit member rural electric systems in nine states, including Wyoming.
3. These member distribution cooperatives, in turn, sell this electricity on a retail basis to their members located in their service territory.
4. Powder River Energy Corporation (“PRECorp”), is a member of [Basin] and generally serves the Campbell County Area.
5. PRECorp members/customers include industrial (mines, coal bed methane, farmers, ranchers and other various types of users). Over the last several years, there has been a surge of coal bed methane (“CBM”) development in PRECorp’s service territory.
6. [Basin] performed studies to attempt to forecast PRECorp’s future load requirements. PRECorp’s current load requirement is approximately 250 megawatts and it has very little capacity to obtain or provide additional electricity.
7. [Basin’s] forecasts predict that in the next ten years there may be more than 150 megawatts of additional demand in PRE-Corp’s service area. The present system is not capable of providing for the needs of this predicted load.
8. The present system of distributing electricity to PRECorp and its members involves a single corridor of supply lines and does not include a loop or grid system.
9. [Basin’s] proposed transmission line must be built to meet the expected load growth, to improve the power grid stability (reliability) and to update equipment.
10. In selecting the proposed route and accesses, [Basin] considered many factors, including but not limited to, the following:
a. Tie-ins or connections to existing electrical system infrastructure.
b. Physical limitations, such as topography, railroad crossings, existing improvements and dry lakebeds, etc.
c. Landowner concerns.
d.' Costs of construction.
*1003 e. Reliability and safety matters (by avoiding paralleling existing high power transmission lines).
f. Minimizing the number of landowners being crossed.
g. Minimizing impact to government property.
h. Minimization of visual impact.
i. Environmental concerns.
11. The proposed route was adjusted to accommodate some landowner concerns. Other landowner concerns could not be accommodated because changes would impact other landowners, change the nature of the grid being created or otherwise result in less net benefit.
12. The proposed route largely crosses undeveloped grassland and avoids residences and other developments.
13. Federal policy is that the public good is served by avoiding federal lands with utility easements to the extent possible.
14. [Basin] considered alternate routes. The other routes would shift private impact to others or would diminish the public good by increasing cost, increasing impact on public lands or preventing installation of a loop/grid system.
15. Some of the [landowners] have electric distribution lines on their property, which have been in service in excess of 50 years.
16. [Basin] obtained time-limited easements from government entities. Those easements will be renewed at a nominal or zero cost, and the time of them does not relate to the life of the proposed power line.
17. It is not possible to determine if the proposed power line will cease to be necessary or useful at some time in the future. The line’s term of service is as long as electricity is needed.
18. [Basin] attempted to negotiate a settlement with [the landowners] in order to avoid the condemnation process. Negotiations to settle with [the landowners] were conducted up through the very morning of the hearing (and several landowners then settled).
19. Over 80% of the private landowners settled with [Basin] prior to the commencement of the hearing on May 3, 2004.
20. [Basin] considered and discussed location, access, timing and price in its negotiations.
21. The final offer made by [Basin] to [the landowners] was generally as follows:
a. $85/rod for the transmission right-of-way. ($1,795.20/acre)
b. $10/rod for the road accesses to the right-of-way. ($800.00/acre)
c. Term of both rights-of-way would be limited to 99 years.
22. The range of values for the fee ownership of the types of land being sought by [Basin] is $248.00/acre for tracts of land larger than 700 acres; and $618.00/ acre for tracts of land smaller than 700 acres.
23. The proposed transmission line and subsequent condemnation is necessary for the public good.
24. [Basin] is seeking only the real estate interests (easements) necessary to effectuate the construction, operation and maintenance of the line.
25. The project is planned and located in the manner that is most compatible with the greatest public good and least private injury.
26. [Basin] made reasonable and diligent efforts to acquire property by good faith negotiation.
27. The condemned easement requires an unlimited length of time, and Wyoming law provides for the same. W.S. § 1-26-515 establishes when, if ever, the condemned easement expires.
28. [Basin] provides wholesale power to PRECorp. [Basin] does not distribute energy in the retail market.
29. [Basin] does not fall within the statutory definition of a public utility in W.S. § 37-1-101 and is not subject to regulation by the Wyoming Public Service Commission.
30. [Basin] acted in good faith when it located the proposed line and negotiated with [the landowners].
*1004 31. A determination of the greatest public good and least private injury involves a balance of those factors. [The landowners] insist on the least private injury to themselves without consideration of potential injury to others or diminished public good.
32. The evidence does not show any valid reason for limiting the time of the proposed easement. [The landowners’] insistence on a term of years in reality is a claim for additional compensation after the term expires.
33. This is an action for condemnation of an interest in real property pursuant to the Wyoming Eminent Domain Act (W-S. § 1-26-501 et seq.) and WRCP 71.1.
34. The Court has jurisdiction over this action pursuant to Article 5, Section 10, Wyoming Constitution.
35. Venue is proper in this Court pursuant to W.S. § 1-5-108.
36. Public interest and necessity require this project. Although [Basin’s] complaint did not specifically use this terminology, the allegations and evidence clearly established that public interest and necessity require this project.
37. Mineral development and industrial growth is in the public interest. This line is necessary to serve that public interest.
38. [Basin] is entitled to acquire easements across the property listed in its complaint by virtue of eminent domain.
IT IS, THEREFORE, HEREBY ORDERED that [Basin] is granted immediate possession of the rights of way and easements set forth in its Amended Complaint, as against all [landowners] who have not stipulated to settlement.

[¶ 13] We will include other pertinent facts as needed in order to flesh out our discussion of the issues.

DISCUSSION

Is Basin a “Public Utility”

[¶ 14] We will discuss the issues in a somewhat different order than as presented by the parties. Whether Basin is a “public utility,” and, therefore, was required to obtain a certificate of public convenience and necessity is a threshold question that must be addressed first.

[¶ 15] This issue arises because Basin contends it is not a “public utility” as contemplated by the governing statute, and because the PSC agreed with that conclusion, thus declining to require Basin to obtain a certificate of public convenience and necessity. Basin is a wholesale power provider, and is a non-profit corporation based in Bismarck, North Dakota. It is owned and controlled by its members. It serves 124 distribution cooperatives throughout a nine-state area. PRECorp is one of the members, and is the largest single user of electricity from Basin. PRECorp and other member owners then sell the electricity to their members. Thus, Basin contends it does not furnish electricity “to or for the public,” but only to its member cooperatives who, in turn, furnish that electricity “to or for the public.”

[¶ 16] With respect to condemnation of private land, the Wyoming Constitution provides, at art. 1, § 32:

§ 32. Eminent domain.
Private property shall not be taken for private use unless by consent of the owner, except for private ways of necessity, and for reservoirs, drains, flumes or ditches on or across the lands of others for agricultural, mining, milling, domestic or sanitary purposes, nor in any case without due compensation.

[¶ 17] Wyo. Stat. Ann. § 37-2-205 (Lex-isNexis 2005) provides:

§ 37-2-205. Certificate of convenience and necessity; hearings.
(a) No public utility shall begin construction of a line, plant or system, or of any extension of a line, plant or system without having first obtained from the commission a certificate that the present or future public convenience and necessity require or will require such construction. This act shall not be construed to require any public utility operating outside of a city or town to secure a certificate for an extension into an area within which it has lawfully commenced operation, or for an extension into territory *1005 contiguous to its line, plant or system for which no certificate is in force and is not served by a public utility of like character or for any extension within or to territory already served by it, necessary in the ordinary course of its business. If any public utility, in constructing or extending its line, plant or system interferes or is about to interfere with the operation of the line, plant or system of any other public utility already authorized or constructed, the commission on complaint of the public utility claiming to be injuriously affected, may after hearing make such order and prescribe the terms and conditions for the location of the lines, plants or systems affected, as to it are just and reasonable. The power companies may, without the certificate, increase capacity of existing plants.
(b) No public utility shall henceforth exercise any right or privilege or obtain a franchise or permit to exercise such right or privilege from a municipality or county, without having first obtained from the commission a certificate that public convenience and necessity require the exercise of such right and privilege; provided, that when the commission shall find, after hearing, that a public utility has heretofore begun actual construction work and is prosecuting such work in good faith, uninterruptedly and with reasonable diligence in proportion to the magnitude of the undertaking, under any franchise or permit heretofore granted but not heretofore actually exercised, such public utility may proceed to the completion of such work, and may, after such completion exercise such right or privilege; and provided, further, that this section shall not be construed to validate any right or privilege now invalid or hereafter becoming invalid under any law of this state, nor impair any vested right in any franchise or permit heretofore granted.
(c) Before any certificate may issue, under this section, a certified copy of its articles of incorporation or charter, if the applicant be a corporation, shall be filed in the office of the commission. The commission shall have power, after hearing involving the financial ability and good faith of the applicant and the necessity of additional service in the community, to issue said certificate, as prayed for, or to refuse to issue the same, or to issue to it for the construction of a portion only of the contemplated line, plant, or system, or of a portion only, of the contemplated line, plant, system or extension thereof, or for the partial exercise only of said right or privilege, and may attach to the exercise of the rights granted by said certificate such terms and conditions as in its judgment the public convenience and necessity may require.
(d) Upon its own motion, or on complaint of any person the commission shall have power to investigate and determine whether the competitive rates, charges and service existing between any public utilities are fair, just and reasonable, after hearing thereon to determine, fix and order such rates, charges, regulations and remedies as will establish reasonable and just rates, between said competing public utilities, and between said public utilities and their customers and patrons.
(e) Where a certificate for the construction and operation of a high voltage electric transmission line of 230 KV or greater is required, the public service commission shall publish notice of application in a newspaper of general circulation in each county where the line will be constructed. The public service commission shall give actual notice of hearing on the application by registered mail at the applicant’s expense to each landowner who may be affected. The notice of hearing shall be given at least thirty (30) days before the hearing is held and shall contain a summary of the pertinent facts about the application.
(f) In the case of a certificate for the construction of a high voltage electric transmission line of 230 KV or greater, the issuance of the certificate shall be conditioned so that no construction of the line is authorized until all right-of-way for the line has been acquired.
(g) Any electric utility which provided service to any part of the annexed area *1006 prior to annexation and which does not receive a franchise from the annexing municipality to serve the annexed area shall receive just compensation from the public or private utility franchised to serve the annexed area. If the affected utilities cannot agree on just compensation within thirty (30) days after the franchise has been issued and become final after any challenge thereto, the affected utilities shall submit the matter to arbitration before the public service commission pursuant to W.S. [§]37-2-113. Upon conclusion of the arbitration proceedings and payment of the compensation determined to be just, ownership of the facilities shall be transferred to the acquiring utility. [Emphases added.]

[¶ 18] “Public utility” is defined by Wyo. Stat. Ann § 37-l-101(a)(vi) (LexisNexis 2005):

(vi) “Public utility” means and includes every person that owns, operates, leases, controls or has power to operate, lease or control:
(A) Any plant, property or facility for the transportation or conveyance to or for the public of passengers or property for hire, except taxicabs operating solely in cities and towns;
(B) Repealed by Laws 1995, eh. 181, § 3.
(C) Any plant, property or facility for the generation, transmission, distribution, sale or furnishing to or for the public of electricity for light, heat or power, including any conduits, ducts or other devices, materials, apparatus or property for containing, holding or carrying conductors used or to be used for the transmission of electricity for light, heat or power;
(D) Any plant, property or facility for the manufacture, distribution, sale or furnishing to or for the public of natural or manufactured gas for lights, heat or power;
(E) Any plant, property or facility for the supply, storage, distribution or furnishing to or for the public of water for manufacturing, municipal, agriculture or domestic uses, except and excluding any such plant, property or facility owned by a municipality;
(F) Any plant, property or facility for the production, transmission, conveyance, delivery or furnishing to or for the public of steam or any other substance for heat or power;
(G) Any plant, property or equipment for the transportation or conveyance to or for the public of oil or gas by pipeline, or any plant, property, or equipment, used for the purpose of transporting, selling or furnishing natural gas to any consumer or consumers within the state of Wyoming for industrial, commercial or residential use, except any such plant, property or equipment used for any of the following purposes is exempted from this and all other provisions of this chapter to the extent of such use:
(I) For the transportation or sale of natural gas within or between oil and gas fields or potential oil and gas fields for residential, commercial, industrial or other use reasonably necessary in the exploration, development or operation of the field;
(II) For drilling, producing, repres-suring, or other oil or gas field operations;
(III) For operation of natural gas processing plants;
(IV) For the sale of natural gas by the producer to a consumer for use in industrial or commercial plants or establishments of any kind or nature.
(H) None of the provisions of this chapter shall apply to:
(I) Interstate commerce except when a regulatory field has not been preempted by the United States government;
(II) To public utilities owned and operated by a municipality of the state of Wyoming, except as to that portion of a municipality owned and operated public utility, if any, as may extend services outside the corporate limits of a municipality and except that if any municipal utility owns an undivided interest in a facility for the production of electricity which is also partly owned by an agency *1007 subject to the jurisdiction of the public service commission, the sale of electricity in excess of the participating municipalities’ need is subject to this act;
(III) To farmers’ mutual telephone associations having no capital stock and furnishing service to members of associations only and without tolls, except as provided in W.S. [§]87-2-205;
(TV) To mutual water companies or associations having no capital stock and furnishing water service to members of companies or associations only, and without charges other than assessments of members to reimburse companies or associations for expenses incurred in their establishment or operation;
(V) To any person who is not otherwise affiliated with a utility, that owns, leases, controls or has power to lease or control any plant, property or facility which, in a transaction approved or authorized by the commission, is leased to one (1) or more public utilities, and is to be operated by the lessee or lessees for the generation, transmission, distribution, sale or furnishing to or for the public of electricity for light, heat, power or other utility purposes;
(VI) To the generation, transmission or distribution of electricity, or to the manufacture or distribution of gas, or to the furnishing or distribution of water, nor to the production, delivery or furnishing of steam or any other substance, by a producer or other person, for the sole use of a producer or other person, or for the use of tenants of a producer or other person and not for sale to others. Such exemptions shall not apply to metered or other direct sales of a utility commodity by a producer or other person to his tenants.
(J) The term “public utility” shall mean and include two (2) or more public utilities rendering joint service;
(K) Any person furnishing coal, water or other raw materials to an electric power company shall not by this fact alone be designated as a public utility;
(M) The provisions of [§§] W.S. 37-6-101 through 37-6-106, relating to the issuance and sale of securities shall not apply to:
(I) Any gas pipeline corporation making direct sales to Wyoming consumers in interstate commerce and not for resale;
(II) Any cooperative electrical generation and transmission association operating in interstate commerce whose rates are not regulated by the Wyoming public service commission. [Emphases added.]

[¶ 19] Wyo. Stat. Ann. § 1-26-815 (Lex-isNexis 2005) provides:

§ 1-26-815. Right of eminent domain granted; ways of necessity for authorized businesses; purposes; extent.
(a) Any person, association, company or corporation authorized to do business in this state may appropriate by condemnation a way of necessity over, across or on so much of the lands or real property of others as necessary for the location, construction, maintenance and use of reservoirs, drains, flumes, ditches including return flow and wastewater ditches, underground water pipelines, pumping stations and other necessary appurtenances, canals, electric power transmission lines and distribution systems, railroad trackage, sidings, spur tracks, tramways, roads or mine truck haul roads required in the course of their business for agricultural, mining, exploration drilling and production of oil and gas, milling, electric power transmission and distribution, domestic, municipal or sanitary purposes, or for the transportation of coal from any coal mine or railroad line or for the transportation of oil and gas from any well.
(b) The right of condemnation may be exercised for the purpose of:
(i) Acquiring, enlarging or relocating ways of necessity; and
(ii) Acquiring easements or rights-of-way over adjacent lands sufficient to enable the owner of the way of necessity to construct, repair, maintain and use the structures, roads or facilities for which the way of necessity is acquired.
*1008 (e) A way of necessity acquired hereunder shall not exceed one hundred (100) feet in width on each side of the outer sides or marginal lines of the reservoir, drain, ditch, underground water pipeline, canal, flume, power transmission line or distribution system, railroad trackage, siding or tramway unless a greater width is necessary for excavation, embankment or deposit of waste from excavation. In no case may the area appropriated exceed that actually necessary for the purpose of use for which a way of necessity is authorized.

[¶ 20] Wyo. Stat. Ann. § 1-26-816 (Lex-isNexis 2005) provides:

§ 1-26-816. Condemnation and certificate of public necessity and convenience.
No person shall institute a condemnation proceeding relating to any facility for which a certificate of public necessity and convenience is required until the certificate has been issued.

[¶ 21] Our analysis of this issue is guided by our traditional rules of statutory construction:

Our standard of review with respect to the construction of statutes is well known. In interpreting statutes, our primary consideration is to determine the legislature’s intent. All statutes must be construed in pari materia and, in ascertaining the meaning of a given law, all statutes relating to the same subject or having the same general purpose must be considered and construed in harmony. Statutory construction is a question of law, so our standard of review is de novo. We endeavor to interpret statutes in accordance with the legislature’s intent. We begin by making an inquiry respecting the ordinary and obvious meaning of the words employed according to their arrangement and connection. We construe the statute as a whole, giving effect to every word, clause, and sentence, and we construe all parts of the statute in pari materia. When a statute is sufficiently clear and unambiguous, we give effect to the plain and ordinary meaning of the words and do not resort to the rules of statutory construction. Wyoming Board of Outfitters and Professional Guides v. Clark, 2001 WY 78, ¶ 12, 30 P.3d 36, ¶ 12 (Wyo.2001); Murphy v. State Canvassing Board, 12 P.3d 677, 679 (Wyo.2000). Moreover, we must not give a statute a meaning that will nullify its operation if it is susceptible of another interpretation. Billis v. State, 800 P.2d 401, 413 (Wyo.1990) (citing McGuire v. McGuire, 608 P.2d 1278,1283 (Wyo.1980)).
Moreover, we will not enlarge, stretch, expand, or extend a statute to matters that do not fall within its express provisions. Gray v. Stratton Real Estate, 2001 WY 125, ¶ 5, 36 P.3d 1127, ¶5 (Wyo.2001); Bowen v. State, Wyoming Real Estate Commission, 900 P.2d 1140, 1143 (Wyo.1995).

In Re Loberg, 2004 WY 48, ¶ 5, 88 P.3d 1045, 1048 (Wyo.2004); Board of County Commissioners of Teton County v. Crow, 2003 WY 40, ¶¶ 40-41, 65 P.3d 720, 733-34 (Wyo.2003).

[¶ 22] In addition, when a particular interpretation has been placed on a statute by the courts, it is presumed that the legislature has acquiesced in that interpretation where it has left the statute materially unchanged at its subsequent meeting