CALVERT CLIFFS' COORDINATING COMMITTEE, INC., et al., Petitioners,
v.
UNITED STATES ATOMIC ENERGY COMMISSION and United States of America, Respondents,
Baltimore Gas and Electric Company, Intervenor.
CALVERT CLIFFS' COORDINATING COMMITTEE, INC., et al., Petitioners,
v.
UNITED STATES ATOMIC ENERGY COMMISSION and United States of America, Respondents.
No. 24839.
No. 24871.
United States Court of Appeals, District of Columbia Circuit.
Argued April 16, 1971.
Decided July 23, 1971.
COPYRIGHT MATERIAL OMITTED Mr. Anthony Z. Roisman, Washington, D. C., with whom Messrs. Myron M. Cherry, Chicago, Ill., and Lewis Drain, Grand Rapids, Mich., were on the brief, for petitioners.
Mr. Marcus A. Rowden, Solicitor, Atomic Energy Commission, with whom Messrs. Howard K. Shapar, Asst. Gen. Counsel, Licensing and Regulation, Atomic Energy Commission, and Edmund Clark, Atty., Department of Justice, were on the brief, for respondents. Mr. William C. Parler, Atty., Atomic Energy Commission, also entered an appearance for respondent Atomic Energy Commission.
Mr. George F. Trowbridge, Washington, D. C., with whom Mr. Jay E. Silberg, Washington, D. C., was on the brief, for intervenor in No. 24,839.
Messrs. George D. Gibson and Arnold H. Quint, Washington, D. C., filed a brief on behalf of Duke Power Company et al. as amici curiae in No. 24,871.
Mr. Roy B. Snapp, Washington, D. C., filed a brief on behalf of Arkansas Power and Light Company as amicus curiae in No. 24,871.
Messrs. Arvin E. Upton, Leonard M. Trosten and Henry V. Nickel, Washington, D. C., filed a brief on behalf of Consolidated Edison Company as amicus curiae in No. 24,871.
Mr. Jerome E. Sharfman, Washington, D. C., filed a brief on behalf of Consumers Power Company as amicus curiae in No. 24,871.
Messrs. H. Edward Dunkelberger, Jr., Christopher M. Little and Peter M. Phillipes, Washington, D. C., filed a brief on behalf of Indiana and Michigan Electric Company and Portland General Electric Company as amici curiae in No. 24,871.
Before WRIGHT, TAMM and ROBINSON, Circuit Judges.
J. SKELLY WRIGHT, Circuit Judge:
These cases are only the beginning of what promises to become a flood of new litigation — litigation seeking judicial assistance in protecting our natural environment. Several recently enacted statutes attest to the commitment of the Government to control, at long last, the destructive engine of material "progress."1 But it remains to be seen whether the promise of this legislation will become a reality. Therein lies the judicial role. In these cases, we must for the first time interpret the broadest and perhaps most important of the recent statutes: the National Environmental Policy Act of 1969 (NEPA).2 We must assess claims that one of the agencies charged with its administration has failed to live up to the congressional mandate. Our duty, in short, is to see that important legislative purposes, heralded in the halls of Congress, are not lost or misdirected in the vast hallways of the federal bureaucracy.
NEPA, like so much other reform legislation of the last 40 years, is cast in terms of a general mandate and broad delegation of authority to new and old administrative agencies. It takes the major step of requiring all federal agencies to consider values of environmental preservation in their spheres of activity, and it prescribes certain procedural measures to ensure that those values are in fact fully respected. Petitioners argue that rules recently adopted by the Atomic Energy Commission to govern consideration of environmental matters fail to satisfy the rigor demanded by NEPA. The Commission, on the other hand, contends that the vagueness of the NEPA mandate and delegation leaves much room for discretion and that the rules challenged by petitioners fall well within the broad scope of the Act. We find the policies embodied in NEPA to be a good deal clearer and more demanding than does the Commission. We conclude that the Commission's procedural rules do not comply with the congressional policy. Hence we remand these cases for further rule making.
* We begin our analysis with an examination of NEPA's structure and approach and of the Atomic Energy Commission rules which are said to conflict with the requirements of the Act. The relevant portion of NEPA is Title I, consisting of five sections.3 Section 101 sets forth the Act's basic substantive policy: that the federal government "use all practicable means and measures" to protect environmental values. Congress did not establish environmental protection as an exclusive goal; rather, it desired a reordering of priorities, so that environmental costs and benefits will assume their proper place along with other considerations. In Section 101(b), imposing an explicit duty on federal officials, the Act provides that "it is the continuing responsibility of the Federal Government to use all practicable means, consistent with other essential considerations of national policy," to avoid environmental degradation, preserve "historic, cultural, and natural" resources, and promote "the widest range of beneficial uses of the environment without * * * undesirable and unintended consequences."
Thus the general substantive policy of the Act is a flexible one. It leaves room for a responsible exercise of discretion and may not require particular substantive results in particular problematic instances. However, the Act also contains very important "procedural" provisions — provisions which are designed to see that all federal agencies do in fact exercise the substantive discretion given them. These provisions are not highly flexible. Indeed, they establish a strict standard of compliance.
NEPA, first of all, makes environmental protection a part of the mandate of every federal agency and department. The Atomic Energy Commission, for example, had continually asserted, prior to NEPA, that it had no statutory authority to concern itself with the adverse environmental effects of its actions.4 Now, however, its hands are no longer tied. It is not only permitted, but compelled, to take environmental values into account. Perhaps the greatest importance of NEPA is to require the Atomic Energy Commission and other agencies to consider environmental issues just as they consider other matters within their mandates. This compulsion is most plainly stated in Section 102. There, "Congress authorizes and directs that, to the fullest extent possible: (1) the policies, regulations, and public laws of the United States shall be interpreted and administered in accordance with the policies set forth in this Act * * *." Congress also "authorizes and directs" that "(2) all agencies of the Federal Government shall" follow certain rigorous procedures in considering environmental values.5 Senator Jackson, NEPA's principal sponsor, stated that "[n]o agency will [now] be able to maintain that it has no mandate or no requirement to consider the environmental consequences of its actions."6 He characterized the requirements of Section 102 as "action-forcing" and stated that "[o]therwise, these lofty declarations [in Section 101] are nothing more than that."7
The sort of consideration of environmental values which NEPA compels is clarified in Section 102(2) (A) and (B). In general, all agencies must use a "systematic, interdisciplinary approach" to environmental planning and evaluation "in decisionmaking which may have an impact on man's environment." In order to include all possible environmental factors in the decisional equation, agencies must "identify and develop methods and procedures * * * which will insure that presently unquantified environmental amenities and values may be given appropriate consideration in decisionmaking along with economic and technical considerations."8 "Environmental amenities" will often be in conflict with "economic and technical considerations." To "consider" the former "along with" the latter must involve a balancing process. In some instances environmental costs may outweigh economic and technical benefits and in other instances they may not. But NEPA mandates a rather finely tuned and "systematic" balancing analysis in each instance.9
To ensure that the balancing analysis is carried out and given full effect, Section 102(2) (C) requires that responsible officials of all agencies prepare a "detailed statement" covering the impact of particular actions on the environment, the environmental costs which might be avoided, and alternative measures which might alter the cost-benefit equation. The apparent purpose of the "detailed statement" is to aid in the agencies' own decision making process and to advise other interested agencies and the public of the environmental consequences of planned federal action. Beyond the "detailed statement," Section 102(2) (D) requires all agencies specifically to "study, develop, and describe appropriate alternatives to recommended courses of action in any proposal which involves unresolved conflicts concerning alternative uses of available resources." This requirement, like the "detailed statement" requirement, seeks to ensure that each agency decision maker has before him and takes into proper account all possible approaches to a particular project (including total abandonment of the project) which would alter the environmental impact and the cost-benefit balance. Only in that fashion is it likely that the most intelligent, optimally beneficial decision will ultimately be made. Moreover, by compelling a formal "detailed statement" and a description of alternatives, NEPA provides evidence that the mandated decision making process has in fact taken place and, most importantly, allows those removed from the initial process to evaluate and balance the factors on their own.
Of course, all of these Section 102 duties are qualified by the phrase "to the fullest extent possible." We must stress as forcefully as possible that this language does not provide an escape hatch for footdragging agencies; it does not make NEPA's procedural requirements somehow "discretionary." Congress did not intend the Act to be such a paper tiger. Indeed, the requirement of environmental consideration "to the fullest extent possible" sets a high standard for the agencies, a standard which must be rigorously enforced by the reviewing courts.
Unlike the substantive duties of Section 101(b), which require agencies to "use all practicable means consistent with other essential considerations," the procedural duties of Section 102 must be fulfilled to the "fullest extent possible."10 This contrast, in itself, is revealing. But the dispositive factor in our interpretation is the expressed views of the Senate and House conferees who wrote the "fullest extent possible" language into NEPA. They stated:11
"* * * The purpose of the new language is to make it clear that each agency of the Federal Government shall comply with the directives set out in * * * [Section 102(2)] unless the existing law applicable to such agency's operations expressly prohibits or makes full compliance with one of the directives impossible. * * * Thus, it is the intent of the conferees that the provision `to the fullest extent possible' shall not be used by any Federal agency as a means of avoiding compliance with the directives set out in section 102. Rather, the language in section 102 is intended to assure that all agencies of the Federal Government shall comply with the directives set out in said section `to the fullest extent possible' under their statutory authorizations and that no agency shall utilize an excessively narrow construction of its existing statutory authorizations to avoid compliance."
Thus the Section 102 duties are not inherently flexible. They must be complied with to the fullest extent, unless there is a clear conflict of statutory authority.12 Considerations of administrative difficulty, delay or economic cost will not suffice to strip the section of its fundamental importance.
We conclude, then, that Section 102 of NEPA mandates a particular sort of careful and informed decisionmaking process and creates judicially enforceable duties. The reviewing courts probably cannot reverse a substantive decision on its merits, under Section 101, unless it be shown that the actual balance of costs and benefits that was struck was arbitrary or clearly gave insufficient weight to environmental values. But if the decision was reached procedurally without individualized consideration and balancing of environmental factors — conducted fully and in good faith — it is the responsibility of the courts to reverse. As one District Court has said of Section 102 requirements: "It is hard to imagine a clearer or stronger mandate to the Courts."13
In the cases before us now, we do not have to review a particular decision by the Atomic Energy Commission granting a construction permit or an operating license. Rather, we must review the Commission's recently promulgated rules which govern consideration of environmental values in all such individual decisions.14 The rules were devised strictly in order to comply with the NEPA procedural requirements — but petitioners argue that they fall far short of the congressional mandate.
The period of the rules' gestation does not indicate overenthusiasm on the Commission's part. NEPA went into effect on January 1, 1970. On April 2, 1970 — three months later — the Commission issued its first, short policy statement on implementation of the Act's procedural provisions.15 After another span of two months, the Commission published a notice of proposed rule making in the Federal Register.16 Petitioners submitted substantial comments critical of the proposed rules. Finally, on December 3, 1970, the Commission terminated its long rule making proceeding by issuing a formal amendment, labelled Appendix D, to its governing regulations.17 Appendix D is a somewhat revised version of the earlier proposal and, at last, commits the Commission to consider environmental impact in its decision making process.
The procedure for environmental study and consideration set up by the Appendix D rules is as follows: Each applicant for an initial construction permit must submit to the Commission his own "environmental report," presenting his assessment of the environmental impact of the planned facility and possible alternatives which would alter the impact. When construction is completed and the applicant applies for a license to operate the new facility, he must again submit an "environmental report" noting any factors which have changed since the original report. At each stage, the Commission's regulatory staff must take the applicant's report and prepare its own "detailed statement" of environmental costs, benefits and alternatives. The statement will then be circulated to other interested and responsible agencies and made available to the public. After comments are received from those sources, the staff must prepare a final "detailed statement" and make a final recommendation on the application for a construction permit or operating license.
Up to this point in the Appendix D rules petitioners have raised no challenge. However, they do attack four other, specific parts of the rules which, they say, violate the requirements of Section 102 of NEPA. Each of these parts in some way limits full consideration and individualized balancing of environmental values in the Commission's decision making process. (1) Although environmental factors must be considered by the agency's regulatory staff under the rules, such factors need not be considered by the hearing board conducting an independent review of staff recommendations, unless affirmatively raised by outside parties or staff members. (2) Another part of the procedural rules prohibits any such party from raising nonradiological environmental issues at any hearing if the notice for that hearing appeared in the Federal Register before March 4, 1971. (3) Moreover, the hearing board is prohibited from conducting an independent evaluation and balancing of certain environmental factors if other responsible agencies have already certified that their own environmental standards are satisfied by the proposed federal action. (4) Finally, the Commission's rules provide that when a construction permit for a facility has been issued before NEPA compliance was required and when an operating license has yet to be issued, the agency will not formally consider environmental factors or require modifications in the proposed facility until the time of the issuance of the operating license. Each of these parts of the Commission's rules will be described at greater length and evaluated under NEPA in the following sections of this opinion.
II
NEPA makes only one specific reference to consideration of environmental values in agency review processes. Section 102(2) (C) provides that copies of the staff's "detailed statement" and comments thereon "shall accompany the proposal through the existing agency review processes." The Atomic Energy Commission's rules may seem in technical compliance with the letter of that provision. They state:
"12. If any party to a proceeding * * * raises any [environmental] issue * * * the Applicant's Environmental Report and the Detailed Statement will be offered in evidence. The atomic safety and licensing board will make findings of fact on, and resolve, the matters in controversy among the parties with regard to those issues. Depending on the resolution of those issues, the permit or license may be granted, denied, or appropriately conditioned to protect environmental values.
"13. When no party to a proceeding * * * raises any [environmental] issue * * * such issues will not be considered by the atomic safety and licensing board. Under such circumstances, although the Applicant's Environmental Report, comments thereon, and the Detailed Statement will accompany the application through the Commission's review processes, they will not be received in evidence, and the Commission's responsibilities under the National Environmental Policy Act of 1969 will be carried out in toto outside the hearing process."18
The question here is whether the Commission is correct in thinking that its NEPA responsibilities may "be carried out in toto outside the hearing process" — whether it is enough that environmental data and evaluations merely "accompany" an application through the review process, but receive no consideration whatever from the hearing board.
We believe that the Commission's crabbed interpretation of NEPA makes a mockery of the Act. What possible purpose could there be in the Section 102 (2) (C) requirement (that the "detailed statement" accompany proposals through agency review processes) if "accompany" means no more than physical proximity — mandating no more than the physical act of passing certain folders and papers, unopened, to reviewing officials along with other folders and papers? What possible purpose could there be in requiring the "detailed statement" to be before hearing boards, if the boards are free to ignore entirely the contents of the statement? NEPA was meant to do more than regulate the flow of papers in the federal bureaucracy. The word "accompany" in Section 102(2) (C) must not be read so narrowly as to make the Act ludicrous. It must, rather, be read to indicate a congressional intent that environmental factors, as compiled in the "detailed statement," be considered through agency review processes.19
Beyond Section 102(2) (C), NEPA requires that agencies consider the environmental impact of their actions "to the fullest extent possible." The Act is addressed to agencies as a whole, not only to their professional staffs. Compliance to the "fullest" possible extent would seem to demand that environmental issues be considered at every important stage in the decision making process concerning a particular action — at every stage where an overall balancing of environmental and nonenvironmental factors is appropriate and where alterations might be made in the proposed action to minimize environmental costs. Of course, consideration which is entirely duplicative is not necessarily required. But independent review of staff proposals by hearing boards is hardly a duplicative function. A truly independent review provides a crucial check on the staff's recommendations. The Commission's hearing boards automatically consider nonenvironmental factors, even though they have been previously studied by the staff. Clearly, the review process is an appropriate stage at which to balance conflicting factors against one another. And, just as clearly, it provides an important opportunity to reject or significantly modify the staff's recommended action. Environmental factors, therefore, should not be singled out and excluded, at this stage, from the proper balance of values envisioned by NEPA.
The Commission's regulations provide that in an uncontested proceeding the hearing board shall on its own "determine whether the application and the record of the proceeding contain sufficient information, and the review of the application by the Commission's regulatory staff has been adequate, to support affirmative findings on" various nonenvironmental factors.20 NEPA requires at least as much automatic consideration of environmental factors. In uncontested hearings, the board need not necessarily go over the same ground covered in the "detailed statement." But it must at least examine the statement carefully to determine whether "the review * * * by the Commission's regulatory staff has been adequate." And it must independently consider the final balance among conflicting factors that is struck in the staff's recommendation.
The rationale of the Commission's limitation of environmental issues to hearings in which parties affirmatively raise those issues may have been one of economy. It may have been supposed that, whenever there are serious environmental costs overlooked or uncorrected by the staff, some party will intervene to bring those costs to the hearing board's attention. Of course, independent review of the "detailed statement" and independent balancing of factors in an uncontested hearing will take some time. If it is done properly, it will take a significant amount of time. But all of the NEPA procedures take time. Such administrative costs are not enough to undercut the Act's requirement that environmental protection be considered "to the fullest extent possible," see text at page 1114, supra. It is, moreover, unrealistic to assume that there will always be an intervenor with the information, energy and money required to challenge a staff recommendation which ignores environmental costs. NEPA establishes environmental protection as an integral part of the Atomic Energy Commission's basic mandate. The primary responsibility for fulfilling that mandate lies with the Commission. Its responsibility is not simply to sit back, like an umpire, and resolve adversary contentions at the hearing stage. Rather, it must itself take the initiative of considering environmental values at every distinctive and comprehensive stage of the process beyond the staff's evaluation and recommendation.21
III
Congress passed the final version of NEPA in late 1969, and the Act went into full effect on January 1, 1970. Yet the Atomic Energy Commission's rules prohibit any consideration of environmental issues by its hearing boards at proceedings officially noticed before March 4, 1971.22 This is 14 months after the effective date of NEPA. And the hearings affected may go on for as much as a year longer until final action is taken. The result is that major federal actions having a significant environmental impact may be taken by the Commission, without full NEPA compliance, more than two years after the Act's effective date. In view of the importance of environmental consideration during the agency review process, see Part II supra, such a time lag is shocking.
The Commission explained that its very long time lag was intended "to provide an orderly period of transition in the conduct of the Commission's regulatory proceedings and to avoid unreasonable delays in the construction and operation of nuclear power plants urgently needed to meet the national requirements for electric power."23 Before this court, it has claimed authority for its action, arguing that "the statute did not lay down detailed guidelines and inflexible timetables for its implementation; and we find in it no bar to agency provisions which are designed to accommodate transitional implementation problems."24
Again, the Commission's approach to statutory interpretation is strange indeed — so strange that it seems to reveal a rather thoroughgoing reluctance to meet the NEPA procedural obligations in the agency review process, the stage at which deliberation is most open to public examination and subject to the participation of public intervenors. The Act, it is true, lacks an "inflexible timetable" for its implementation. But it does have a clear effective date, consistently enforced by reviewing courts up to now. Every federal court having faced the issues has held that the procedural requirements of NEPA must be met in order to uphold federal action taken after January 1, 1970.25 The absence of a "timetable" for compliance has never been held sufficient, in itself, to put off the date on which a congressional mandate takes effect. The absence of a "timetable," rather, indicates that compliance is required forthwith.
The only part of the Act which even implies that implementation may be subject, in some cases, to some significant delay is Section 103. There, Congress provided that all agencies must review "their present statutory authority, administrative regulations, and current policies and procedures for the purpose of determining whether there are any deficiencies or inconsistencies therein which prohibit full compliance" with NEPA. Agencies finding some such insuperable difficulty are obliged to "propose to the President not later than July 1, 1971, such measures as may be necessary to bring their authority and policies into conformity with the intent, purposes, and procedures set forth in this Act."
The Commission, however, cannot justify its time lag under these Section 103 provisions. Indeed, it has not attempted to do so; only intervenors have raised the argument. Section 103 could support a substantial delay only by an agency which in fact discovered an insuperable barrier to compliance with the Act and required time to formulate and propose the needed reformative measures. The actual review of existing statutory authority and regulations cannot be a particularly lengthy process for experienced counsel of a federal agency. Of course, the Atomic Energy Commission discovered no obstacle to NEPA implementation. Although it did not report its conclusion to the President until October 2, 1970, that nine-month delay (January to October) cannot justify so long a period of noncompliance with the Act. It certainly cannot justify a further delay of compliance until March 4, 1971.
No doubt the process formulating procedural rules to implement NEPA takes some time. Congress cannot have expected that federal agencies would immediately begin considering environmental issues on January 1, 1970. But the effective date of the Act does set a time for agencies to begin adopting rules and it demands that they strive, "to the fullest extent possible," to be prompt in the process. The Atomic Energy Commission has failed in this regard.26 Consideration of environmental issues in the agency review process, for example, is quite clearly compelled by the Act.27 The Commission cannot justify its 11-month delay in adopting rules on this point as part of a difficult, discretionary effort to decide whether or not its hearing boards should deal with environmental questions at all.
Even if the long delay had been necessary, however, the Commission would not be relieved of all NEPA responsibility to hold public hearings on the environmental consequences of actions taken between January 1, 1970 and final adoption of the rules. Although the Act's effective date may not require instant compliance, it must at least require that NEPA procedures, once established, be applied to consider prompt alterations in the plans or operations of facilities approved without compliance.28 Yet the Commission's rules contain no such provision. Indeed, they do not even apply to the hearings still being conducted at the time of their adoption on December 3, 1970 — or, for that matter, to hearings initiated in the following three months. The delayed compliance date of March 4, 1971, then, cannot be justified by the Commission's long drawn out rule making process.
Strangely, the Commission has principally relied on more pragmatic arguments. It seems an unfortunate affliction of large organizations to resist new procedures and to envision massive roadblocks to their adoption. Hence the Commission's talk of the need for an "orderly transition" to the NEPA procedures. It is difficult to credit the Commission's argument that several months were needed to work the consideration of environmental values into its review process. Before the enactment of NEPA, the Commission already had regulations requiring that hearings include health, safety and radiological matters.29 The introduction of environmental matters cannot have presented a radically unsettling problem. And, in any event, the obvious sense of urgency on the part of Congress should make clear that a transition, however "orderly," must proceed at a pace faster than a funeral procession.
In the end, the Commission's long delay seems based upon what it believes to be a pressing national power crisis. Inclusion of environmental issues in pre-March 4, 1971 hearings might have held up the licensing of some power plants for a time. But the very purpose of NEPA was to tell federal agencies that environmental protection is as much a part of their responsibility as is protection and promotion of the industries they regulate. Whether or not the spectre of a national power crisis is as real as the Commission apparently believes, it must not be used to create a blackout of environmental consideration in the agency review process. NEPA compels a case-by-case examination and balancing of discrete factors. Perhaps there may be cases in which the need for rapid licensing of a particular facility would justify a strict time limit on a hearing board's review of environmental issues; but a blanket banning of such issues until March 4, 1971 is impermissible under NEPA.
IV
The sweep of NEPA is extraordinarily broad, compelling consideration of any and all types of environmental impact of federal action. However, the Atomic Energy Commission's rules specifically exclude from full consideration a wide variety of environmental issues. First, they provide that no party may raise and the Commission may not independently examine any problem of water quality — perhaps the most significant impact of nuclear power plants. Rather, the Commission indicates that it will defer totally to water quality standards devised and administered by state agencies and approved by the federal government under the Federal Water Pollution Control Act.30 Secondly, the rules provide for similar abdication of NEPA authority to the standards of other agencies:
"With respect to those aspects of environmental quality for which environmental quality standards and requirements have been established by authorized Federal, State, and regional agencies, proof that the applicant is equipped to observe and agrees to observe such standards and requirements will be considered a satisfactory showing that there will not be a significant, adverse effect on the environment. Certification by the appropriate agency that there is reasonable assurance that the applicant for the permit or license will observe such standards and requirements will be considered dispositive for this purpose."31
The most the Commission will do is include a condition in all construction permits and operating licenses requiring compliance with the water quality or other standards set by such agencies.32 The upshot is that the NEPA procedures, viewed by the Commission as superfluous, will wither away in disuse, applied only to those environmental issues wholly unregulated by any other federal, state or regional body.
We believe the Commission's rule is in fundamental conflict with the basic purpose of the Act. NEPA mandates a case-by-case balancing judgment on the part of federal agencies. In each individual case, the particular economic and technical benefits of planned action must be assessed and then weighed against the environmental costs; alternatives must be considered which would affect the balance of values. See text at page 1113 supra. The magnitude of possible benefits and possible costs may lie anywhere on a broad spectrum. Much will depend on the particular magnitudes involved in particular cases. In some cases, the benefits will be great enough to justify a certain quantum of environmental costs; in other cases, they will not be so great and the proposed action may have to be abandoned or significantly altered so as to bring the benefits and costs into a proper balance. The point of the individualized balancing analysis is to ensure that, with possible alterations, the optimally beneficial action is finally taken.
Certification by another agency that its own environmental standards are satisfied involves an entirely different kind of judgment. Such agencies, without overall responsibility for the particular federal action in question, attend only to one aspect of the problem: the magnitude of certain environmental costs. They simply determine whether those costs exceed an allowable amount. Their certification does not mean that they found no environmental damage whatever. In fact, there may be significant environmental damage (e. g., water pollution), but not quite enough to violate applicable (e. g., water quality) standards. Certifying agencies do not attempt to weigh that damage against the opposing benefits. Thus the balancing analysis remains to be done. It may be that the environmental costs, though passing prescribed standards, are nonetheless great enough to outweigh the particular economic and technical benefits involved in the planned action. The only agency in a position to make such a judgment is the agency with overall responsibility for the proposed federal action — the agency to which NEPA is specifically directed.
The Atomic Energy Commission, abdicating entirely to other agencies' certifications, neglects the mandated balancing analysis. Concerned members of the public are thereby precluded from raising a wide range of environmental issues in order to affect particular Commission decisions. And the special purpose of NEPA is subverted.
Arguing before this court, the Commission has made much of the special environmental expertise of the agencies which set environmental standards. NEPA did not overlook this consideration. Indeed, the Act is quite explicit in describing the attention which is to be given to the views and standards of other agencies. Section 102 (2) (C) provides:
"Prior to making any detailed statement, the responsible Federal official shall consult with and obtain the comments of any Federal agency which has jurisdiction by law or special expertise with respect to any environmental impact involved. Copies of such statement and the comments and views of the appropriate Federal, State, and local agencies, which are authorized to develop and enforce environmental standards, shall be made available to the President, the Council on Environmental Quality and to the public * * *."
Thus the Congress was surely cognizant of federal, state and local agencies "authorized to develop and enforce environmental standards." But it provided, in Section 102(2) (C), only for full consultation. It most certainly did not authorize a total abdication to those agencies. Nor did it grant a license to disregard the main body of NEPA obligations.
Of course, federal agencies such as the Atomic Energy Commission may have specific duties, under acts other than NEPA, to obey particular environmental standards. Section 104 of NEPA makes clear that such duties are not to be ignored:
"Nothing in Section 102 or 103 shall in any way affect the specific statutory obligations of any Federal agency (1) to comply with criteria or standards of environmental quality, (2) to coordinate or consult with any other Federal or State agency, or (3) to act, or refrain from acting contingent upon the recommendations or certification of any other Federal or State agency."
On its face, Section 104 seems quite unextraordinary, intended only to see that the general procedural reforms achieved in NEPA do not wipe out the more specific environmental controls imposed by other statutes. Ironically, however, the Commission argues that Section 104 in fact allows other statutes to wipe out NEPA.
Since the Commission places great reliance on Section 104 to support its abdication to standard setting agencies, we should first note the section's obvious limitation. It deals only with deference to such agencies which is compelled by "specific statutory obligations." The Commission has brought to our attention one "specific statutory obligation": the Water Quality Improvement Act of 1970 (WQIA).33 That Act prohibits federal licensing bodies, such as the Atomic Energy Commission, from issuing licenses for facilities which pollute "the navigable waters of the United States" unless they receive a certification from the appropriate agency that compliance with applicable water quality standards is reasonably assured. Thus Section 104 applies in some fashion to consideration of water quality matters. But it definitely cannot support — indeed, it is not even relevant to — the Commission's wholesale abdication to the standards and certifications of any and all federal, state and local agencies dealing with matters other than water quality.
As to water quality, Section 104 and WQIA clearly require obedience to standards set by other agencies. But obedience does not imply total abdication. Certainly, the language of Section 104 does not authorize an abdication. It does not suggest that other "specific statutory obligations" will entirely replace NEPA. Rather, it ensures that three sorts of "obligations" will not be undermined by NEPA: (1) the obligation to "comply" with certain standards, (2) the obligation to "coordinate" or "consult" with certain agencies, and (3) the obligation to "act, or refrain from acting contingent upon" a certification from certain agencies. WQIA imposes the third sort of obligation. It makes the granting of a license by the Commission "contingent upon" a water quality certification. But it does not require the Commission to grant a license once a certification has been issued. It does not preclude the Commission from demanding water pollution controls from its licensees which are more strict than those demanded by the applicable water quality standards of the certifying agency.34 It is very important to understand these facts about WQIA. For all that Section 104 of NEPA does is to reaffirm other "specific statutory obligations." Unless those obligations are plainly mutually exclusive with the requirements of NEPA, the specific mandate of NEPA must remain in force. In other words, Section 104 can operate to relieve an agency of its NEPA duties only if other "specific statutory obligations" clearly preclude performance of those duties.
Obedience to water quality certifications under WQIA is not mutually exclusive with the NEPA procedures. It does not preclude performance of the NEPA duties. Water quality certifications essentially establish a minimum condition for the granting of a license. But they need not end the matter. The Commission can then go on to perform the very different operation of balancing the overall benefits and costs of a particular proposed project, and consider alterations (above and beyond the applicable water quality standards) which would further reduce environmental damage. Because the Commission can still conduct the NEPA balancing analysis, consistent with WQIA, Section 104 does not exempt it from doing so. And it, therefore, must conduct the obligatory analysis under the prescribed procedures.
We believe the above result follows from the plain language of Section 104 of NEPA and WQIA. However, the Commission argues that we should delve beneath the plain language and adopt a significantly different interpretation. It relies entirely upon certain statements made by Senator Jackson and Senator Muskie, the sponsors of NEPA and WQIA respectively.35 Those statements indicate that Section 104 was the product of a compromise intended to eliminate any conflict between the two bills then in the Senate. The overriding purpose was to prevent NEPA from eclipsing obedience to more specific standards under WQIA. Senator Muskie, distrustful of "self-policing by Federal agencies which pollute or license pollution," was particularly concerned that NEPA not undercut the independent role of standard setting agencies.36 Most of his and Senator Jackson's comments stop short of suggesting that NEPA would have no application i