Chemical Manufacturers Association v. U.S. Environmental Protection Agency, No. 87-4849
AI Case Brief
Generate an AI-powered case brief with:
Estimated cost: $0.001 - $0.003 per brief
Full Opinion
Acting under the mandate of the Clean Water Act (CWA), 1 the Environmental Protection Agency (EPA), has promulgated final regulations limiting the discharge of pollutants into the nation’s navigable waters by manufacturing plants in the organic chemicals, plastics, and synthetic fibers (OCPSF) industries. The regulations, which the statute requires to be implemented beginning March 31,1989, cover both direct discharge and indirect discharge through publicly-owned treatment works (POTWs). The Chemical . Manufacturers Association (CMA) and a number of companies affected by the regulations allege both procedural defects in their promulgation and substantive defects in various provisions, as well as defects in the application of specific provisions to particular plants. Intervening in some of the cases consolidated for review and appearing as amicus curiae in the others, the Natural Resources Defense Council (NRDC) also challenges the regulations, but on the different ground that they fail to require a sufficiently high degree of effluent pollution control. Although it contends that the regulations are invalid, the NRDC urges that they be enforced until more stringent standards can be adopted.
The case is of such complexity that the parties have submitted briefs totalling more than 3,000 pages and a joint appendix 9,000 pages long distilled from a 600,000-page administrative record. To enable us to render a decision as promptly as possible, the members of the panel have divided responsibility for preparing portions of this opinion, as the District of Columbia Circuit did in Alabama Power Co. v. Costle. 2 Judge Garza prepared sections V, VI, and VII of this opinion, as well as all portions discussing issues raised by the NRDC; Judge Rubin prepared sections I and III; and Judge King prepared sections II and IV, except for those portions discussing issues raised by the NRDC.
This is a summary of our rulings on the principal issues:
I. The EPA did not violate the notice- and-comment requirements of the Administrative Procedure Act (APA) by: (1) utilizing an updated Dun & Bradstreet economic-impact study to supplement data it had previously disclosed without making the new data public either during the notice- and-comment period or in the public record except to this court under seal; or (2) by failing to publish its regulations for the control of toxic metals for public comment prior to final promulgation.
II. Best Practicable Technology (BPT) Issues:
A. The EPA’s Consideration of the Costs of Complying with the BPT Limitations:
1. The Act does not require the EPA to apply a “knee-of-the-curve” cost-effectiveness test in establishing BPT limitations; the EPA sufficiently considered the total costs of the BPT limitations in relation to the effluent-reduction benefits and this is all that the Act requires.
2. The BCT cost-effectiveness test does not replace the BPT cost requirement.
3. Although the BPT limitations will double industry’s current costs for the removal of conventional pollutants, these costs are not sufficiently high to make the Administrator’s decision arbitrary or capricious; identifying the point of diminishing returns is within the discretion of the Administrator.
B. The EPA’s Definition of the BPT Data Base:
1. The EPA did not use unreasonably weak statistical editing criteria to determine the “average of the best” dischargers in defining the BPT data base.
*185 2.The EPA’s rejection of polishing ponds and multimedia filtration as the BPT model technology was not arbitrary or capricious; the EPA determined that the benefits of polishing ponds relative to their costs were not substantial and that the effectiveness of multimedia filtration was not well demonstrated.
C. The “Summer/Winter Issue”:
The EPA’s determination that neither special subcategorization nor establishing special limits was necessary for plants utilizing biological treatment systems in colder climates was not arbitrary or capricious; the record shows that the performances of such plants were comparable to those in other regions and technological modifications are available to account for the limited instances in which cold weather may affect treatment performance.
D. BPT Subcategorization:
1. The EPA’s use, in part, of Standard Industrial Classification (SIC) codes for the purpose of categorizing the OCPSF industry was reasonable; because SIC codes are based on product type, the EPA could reasonably assume that plants producing similar products would have similar wastes-treams.
2. The NRDC’s contention that the EPA failed to provide public notice of its intent to limit the applicability of the regulations to certain SIC codes is without merit; as early as 1985 the EPA defined the OCPSF industries to include all facilities within specified SIC codes.
E. Issues Concerning Waste Stabilization Ponds:
1. The EPA’s determination that pond algae are conventional pollutants is consistent with the Act, which defines a conventional pollutant as a biological oxygen-demanding substance or a suspended solid.
2. The EPA’s decision not to create a subcategory for plants employing waste stabilization pond treatment systems was reasonable, because the EPA determined that more effective technology was available; the EPA need not create separate subcategories for industry members that install less effective technology than the model technology.
3. The EPA adequately considered the compliance costs that will be incurred by plants utilizing pond technology.
4. The EPA’s suggestion in the final regulations that copper sulfate could be used to control pond algae was in response to the industrial petitioners’ comments and thus did not require further notice and comment under the Administrative Procedure Act.
5. The costs of the BPT limitations are not wholly disproportionate to its benefits.
F.Plant-Specific Challenges to the BPT Limitations and the Availability of Fundamentally-Different-Factor Variances
1. The EPA reasonably concluded that the BPT limitations for biological oxygen-demanding substances were achievable for Union Carbide’s plants through the use of biological treatment.
2. The EPA reasonably concluded that the BPT limitations were achievable for Borg-Warner’s plants and others with phenol-dominated wastestreams.
3. DuPont’s claim that the wastestream of its Chambers Works plant is uniquely complex, precluding compliance with the BPT limitations, is not a basis for invalidating the limitations.
4. The EPA’s decision not to create a separate subcategory, as urged by Ethyl and Monsanto, for plants with high concentrations of influent total-dissolved solids was reasonable; there was insufficient evidence that any plant has enough total dissolved solids to preclude effective treatment.
5. The plant-specific challenges of Union Carbide, Borg-Warner, Dow, Monsanto, and Ethyl that their plants cannot meet the limits are without merit because the Act does not require the EPA to consider allegedly fundamentally different factors of individual plants in promulgating nationwide BPT limitations for an industry; the CWA *186 provides that fundamentally different factors of plants that preclude compliance must be considered in a collateral variance proceeding.
III. Best Available Technology (BAT) Issues:
A. The EPA’s Statistical Methodology:
1. The EPA’s use of weighted averaging to derive long-term averages was not an abuse of discretion.
2. The EPA’s averaging of variability factors in deriving effluent limits was not an abuse of discretion.
B. Remedy for Unavoidable Exceedanc-es:
1.The EPA’s decision to exclude extremely high discharges from the calculation of “variability factors” was reasonable, and the “upset defense” is a sufficient remedy for exceedances that result from exceptional circumstances beyond the control of the plant operator.
C. The EPA’s Analytical Methodology:
1. The industrial petitioners failed to demonstrate that the EPA’s statistical model did not account for analytical variability.
2. This court defers to the EPA’s determination that the presence of multiple pollutants in a plant’s wastestream did not preclude accurate measurement of those pollutants.
3. The EPA employed reasonable criteria for the use of borrowed data when performance data for a particular pollutant were not available.
4. The EPA’s error, if any, in determining “minimum analytical values” was accounted for by the EPA’s conservative methodology which ensured that the limitations are achievable.
5. The industrial petitioners were not prejudiced by changes in analytical methods in the development of the OCPSF limitations.
D. Use of Minimum Analytical Values for Enforcement Purposes:
The petitioners’ claim that a non-detect reading should be considered zero for enforcement purposes is not ripe for review because the EPA has not adopted a formal policy on this issue.
E. The EPA’s Sampling Techniques:
1. The industrial petitioners failed to demonstrate that the effluent discharge limits were based on inaccurate EPA sampling.
F. The EPA’s Application of the Limitations for Toxic Pollutants to All OCPSF Dischargers:
1. The EPA did not abuse its discretion by subjecting all OCPSF dischargers to the limits for all toxics.
2. The EPA provided adequate public notice that it was considering subjecting all dischargers to the limits for all toxics.
3. Even if this is the proper court in which to raise the issue, the EPA’s limitations for toxic pollutants do not violate the consent decree in NRDC v. Train.
G. BAT Subcategorization:
1. The EPA violated the notice and comment requirement of the Administrative Procedure Act by failing to publish for public comments its BAT subcategorization prior to final promulgation of the regulations.
H. DuPont’s Chambers Works Plant:
I. DuPont’s assertion that its Chambers Works plant will not be able to comply with the BAT limitations because of the plant’s uniquely complex wastestream is not a basis for invalidating the limitations.
I. The BAT Limitations for Phenol:
1. Borg-Warner failed to demonstrate that the BAT limitations for phenol are unachievable for plants with phenol-dominated wastestreams; the record shows that such plants are capable of meeting the limitations.
2. Borg-Warner failed to demonstrate that the EPA’s cost estimates were not a *187 reasonable approximation of the costs the industry will have to incur to meet the BAT limitations.
J. The BAT2 Limitations for Volatile Pollutants Based on Steam Stripping Technology:
1. PPG and Dow have failed to demonstrate that the BAT2 limitations for volatile pollutants are not achievable; the record shows that at least one of the plants in the data base was able to meet the limitations for each pollutant.
2. Because the EPA determined that the limitations could be met by all plants regardless of their wastestream characteristics, the EPA did not abuse its discretion by failing to further subcategorize the plants subject to the limitations for volatile pollutants on the basis of wastestream characteristics.
3. Because the EPA determined that steam-stripper maintenance could be conducted without discharging volatile pollutants, the EPA did not abuse its discretion by failing to make an allowance for such discharge in the limitations.
4. Dow Chemical’s claim that two of its plants will not be able to meet the limitations for volatile pollutants is not a basis for invalidating the limitations.
K. The BAT2 Limitations for Priority Pollutants Based on In-Plant Biological Treatment:
1. CMA has failed to demonstrate that the EPA’s reliance on data from end-of-pipe biological treatment systems in deriving the BAT2 limitations was arbitrary or capricious.
2. CMA has failed to demonstrate that the EPA’s cost estimates for in-plant biological treatment systems are not a reasonable approximation of the type and cost of the technology that industry will have to utilize to meet the limitations.
3. Contrary to CMA’s assertion, the record shows that the EPA considered the land costs associated with in-plant biological treatment systems.
L.Compliance Deadline:
1.The EPA’s post-deadline enforcement policy provides an adequate time extension for industry members that will not have sufficient time to install the technology required to meet the limitations.
IV. Pretreatment Standards for Existing Sources (PSES) Issues:
A. “Pass Through” Issues:
1. The EPA properly selected pollutants that pass through POTWs for the pretreatment standards.
2. The EPA’s decision to define “pass through” based on POTW average removal, rather than actual reported removal, does not violate the CWA.
3. The EPA’s decision not to find pass through of chromium, copper, and nickel, which contaminate sludge, was not arbitrary or capricious because sludge pollutants will be subject to future rulemaking proceedings.
B. The EPA’s failure to establish PSES for six volatile pollutants was not arbitrary or capricious because some of these pollutants were sufficiently controlled by the limits for structurally similar compounds and the EPA did not have sufficient POTW removal data to fix limits for the other pollutants.
C. Application of PSES to Small Dis-chargers:
1. The EPA’s decision not to exempt small indirect dischargers from PSES and not to establish a different standard for these dischargers was reasonable; the record supports the EPA’s determination that the economic impact of PSES on these dischargers was not so disproportionate to the impact on the industry as a whole as to require a separate subcategory.
2. The Synthetic Organic Chemical Manufacturers Association (SOCMA) failed to demonstrate that the EPA’s cost projection for PSES was not reasonable.
3. The EPA reasonably rejected SOC-MA’s proposal that the EPA regulate only *188 small plants producing large discharges; such a plan would leave substantial pollutant discharges unregulated.
D. Application of PSES to Paint/Resin Plants:
1. The EPA’s reliance on data from resin plants in promulgating PSES does not make the standards inapplicable to combined paint/resin plants; the EPA found that the wastestreams of resin plants and paint resin plants were equally treatable.
2. The National Paint and Coatings Association has failed to demonstrate that PSES as applied to paint/resin plants are not economically achievable; the EPA identified cost-effective means of segregating the resin stream from such plants thereby making separate regulation of the resin stream possible.
3. The EPA’s regulation of the resin discharge of combined paint/resin plants does not violate the NRDC v. Train consent decree which exempts paint manufacturers from regulation.
4. The regulations make it clear which resin manufacturers are subject to PSES.
E. The EPA’s Decision Not to Subcate-gorize on the Basis of POTW Removal Credits:
1. The EPA is not required to subcate-gorize on the basis of POTW removal credits; Congress intended that credits for a POTW’s pollutant removal would be available only after the EPA completes its comprehensive sludge regulations.
2. Because Congress has suspended the removal credits regulations, this court need not address the claims of Gulf Coast Waste Disposal Authority and the Village of Sau-get POTWs that they supplied the EPA with sufficient data to support their claims for removal credits or subcategorization.
3.Gulf Coast Waste Disposal Authority is bound by the consent decree in United States v. Crown Central Petroleum Corporation which requires Gulf Coast to recognize and enforce the pretreatment standards.
V. New Source Performance Standards (NSPS) Issues:
1. The EPA’s application of BPT- and BAT-costing methods to NSPS was reasonable.
2. The EPA’s failure to consider was-testream recycling as a model technology in promulgating NSPS was arbitrary; the record indicates that recycling is a well-demonstrated technology resulting in substantially higher pollutant removal.
VI. Montreal Protocol Issue:
A. The EPA’s failure to consider the economic consequences of the “Montreal Protocol on Substances that Deplete the Ozone Layer” in the cost analysis of the chlorofluorocarbon industry was not arbitrary or capricious, because the issue was never brought to the EPA’s attention and at the time the regulations were promulgated the Montreal Protocol was not yet in force.
VII. Issues Concerning the Scope of the OCPSF Limitations:
1. This court is without jurisdiction to review NRDC’s claim that the EPA's reservation of nonconventional pollutants and eight priority pollutants for future rule-making was contrary to the CWA; such a challenge must be raised in the first instance in the district court.
2. The EPA reasonably concluded that the OCPSF limitations apply to research as well as manufacturing discharges.
Table of Contents
Introduction: Page
Statutory Background 195
*189 Page
Standards of Review. 197
I. Procedural Challenges. 200
1. The EPA’s Economic-Impact Study. 200
2. Limits on Metal-Bearing Wastestreams. 202
II. Best Practicable Technology (BPT) Issues. 203
A. The EPA’s Consideration of the Industry’s Costs of Complying with the BPT Limitations. 204
1. CMA’s Challenge Based on the “Knee-of-the-Curve” Cost-Effectiveness Test. 204
2. The BCT Cost-Effectiveness Test. 206
3. The Cost of Compliance with the BPT Limitations.207
B. The EPA’s Definition of the BPT Data Base. 207
1. The EPA’s Determination of the “Average of the Best” Dischargers. 207
2. The EPA’s Rejection of Sequential Treatment Options 208
C. The “Summer/Winter Issue”: The EPA’s Decision Not to Subcategorize Based on Climatic Differences.. 210
1. Diversity of the Data Base. 211
2. Winter Removal Efficiencies 213
*190 Page
D. BPT Subcategorization and the EPA’s Use of Standard Industrial Classification (SIC) Codes. 214
1. CMA’s Challenge to the BPT Subcategorization. 214
2.NRDC’s Notice and Comment Challenge
E. Issues Concerning Waste-Stabilization Ponds. 217
1. The EPA’s Determination that Pond Algae Were Conventional Pollutants and Thus Subject to BPT Regulations. 217
2. The EPA’s Decision Not to Create a Subcategory for Plants Utilizing Waste-Stabilization Ponds. 218
3. The EPA’s Consideration of the Cost of Compliance for Plants Utilizing Pond Technology. 219
4. Copper Sulfate Treatment for Algae Control. 220
5. The Cost of the BPT Limitations.221
F. Plant-Specific Challenges to the BPT Limitations and the Availability of Fundamentally-Different-Factor Variances. 221
1. Union Carbide. 222
2. Borg-Warner. 223
3. DuPont’s Chambers Works Plant. 223
4. Monsanto and Ethyl. 223
5.FDF Variances 225
*191 Page
III. Best Available Technology (BAT) Issues. 226
A. The EPA’s Statistical Method of Developing the BAT Limitations. 227
1. The EPA’s Use of Weighted Averaging in Deriving the Long-Term Averages. 227
2. Averaging of Variability Factors. 228
B. Remedy for Unavoidable Exceedances. 228
C. The EPA’s Analytical Methodology. 230
1. Analytical Variability. 230
2. Complex Wastestreams. 230
3. Computation of Variability Factors When Data Were Insufficient (“Borrowed Data”). 231
4. CMA’s Challenge to the EPA’s Choice of the Minimum Analytical Value to Assign to Non-Detect Readings 231
5. Changes in Analytical Methods . 233
D. Use of Minimum Analytical Values for Enforcement Purposes. 233
E. The EPA’s Sampling Techniques. 233
F. The EPA’s Toxic Limitations. 234
1. Application of the Toxic Limitations to All OCPSF Dis-chargers . 234
*192 Page
2. Courtaulds’ Notice-and-Comment Challenge. 235
3. The NRDC v. Train Consent Decree. 235
G. NRDC’s Challenge to the EPA’s BATi and BAT2 Subeategorization. 235
H. DuPont’s Chambers Works Plant. 236
I. BAT Limitations for Phenol. 236
1. Phenol-Dominated Wastestreams. 236
2. The EPA’s Cost Estimates for the Phenol Limitations 237
J. The BAT2 Limitations for Volatile Pollutants Based on Steam-Stripper Technology. 238
1. Achievability of the Limitations. 238
2. Wastestream Characteristics. 239
3. Steam-Stripper Maintenance .239
4. Dow Chemical’s Plant-Specific Claims. 240
K. The BAT2 Limitations for Priority Pollutants Based on In-Plant Biological Treatment. 240
1. Achievability of the Limitations. 240
2. The EPA’s Estimate of the Costs of Complying with the Limitations. 241
*193 Page
3. Land Costs . 241
L. Compliance Deadline... 242
1. Lack of Sufficient Lead Time for Industry Members to Comply. 242
2. “Availability” of BAT Technology. 243
IV. Pretreatment Standards for Existing Sources (PSES) Issues_243
A. “Pass Through” Issues . 243
1. The EPA’s Definition of “Pass Through”. 243
2. The EPA’s Methodology in Assuming an Absence of “Pass Through” Based on POTW Averages. 247
3. The EPA’s Decision Not to Find “Pass Through” Based on Sludge Contamination. 247
B. The EPA’s Decision Not to Regulate Six Volatile Organic Pollutants on the Basis of Interference with POTW Worker Safety. 248
C. Application of PSES to Small Plants. 249
1. Economic Impact of PSES on Small Dischargers. 249
2. Validity of the EPA’s Cost Assessment. 252
3. Alternative Pretreatment Standards. 252
D.Application of PSES to Paint/Resin Plants 253
*194 Page
1. The EPA’s Data Base. 253
2. Achievability. 254
3. The NRDC v. Train Consent Decree. 256
4. Subcategorization. 257
E. The EPA’s Decision Not to Subcategorize on the Basis of POTW Removal Credits. 257
1. Removal Credits. 258
2. GCWDA and Village of Sauget POTWs. 261
3. Crown Central Petroleum Consent Decree. 261
V. New Source Performance Standards (NSPS) Issues. 261
1. The EPA’s Cost Test in Establishing NSPS. 262
2. NRDC’s Challenge that the EPA Failed to Consider Technology Beyond BPT and BAT. 262
VI.The Economic Impact of the Montreal Protocol on the Chlorofluorocarbon Industry. 264
VII. Scope of the Regulations. 265
1. The EPA’s Reservation of Nonconventional Pollutants and Eight Priority Pollutants for Future Rulemaking 265
*195 Page
2. Application of the Regulations to Laboratory Discharges . 266
Conclusion 266
Statutory Background
The purpose of the Clean Water Act (CWA) is to restore and maintain the chemical and biological integrity of the nation’s waters. 3 It was adopted to effectuate Congress’s declared “national goal that the discharge of pollutants into the navigable waters be eliminated by 1985,” 4 a date later extended to March 31, 1989, 5 and to prohibit “the discharge of toxic pollutants in toxic amounts.” 6
Until 1972, the federal government relied primarily on state and local action to accomplish federal pollution-abatement goals. 7 Congress became dissatisfied, however, with the division of responsibility for setting standards between federal and state water-pollution-control agencies, with the EPA’s dilatory pace, and with the ponderous federal enforcement procedure. Consequently, it enacted the Federal Water Pollution Control Act (FWPCA) Amendments of 1972, 8 which imposed greater federal regulatory responsibilities and set deadlines for the completion of limitations on pollutant effluents.
Because the EPA had failed timely to fulfill its responsibilities under the 1972 Act, the Natural Resources Defense Council (NRDC) filed suit in NRDC v. Train challenging the EPA’s failure to promulgate the effluent standards mandated for toxic substances. The consent decree entered into by the EPA, NRDC, and various industrial intervenors in that suit established a schedule for Agency promulgation of effluent limits, new source standards, and pretreatment standards for priority toxic pollutants. 9
Recognizing the growing seriousness of the problems created by toxic pollution and the inadequacy of the 1972 FWPCA to deal with them, 10 Congress amended that Act by adopting the CWA in 1977. 11 As thus amended, the FWPCA contains several distinct, though interlocking, regulatory schemes.
First, Title II of the Act encourages the construction of publicly-owned waste-treatment works by providing federal grants-in-aid to states for the construction of such plants. 12 As a condition of receiving grants-in-aid, the Act requires states to establish area-wide management agencies with both planning and regulatory functions for waste treatment.
The second regulatory feature of the FWPCA, as set out in Title III, authorizes the EPA to set and to enforce federal effluent standards. This part of the 1977 *196 statute codifies the toxics consent decree issued by the United States District Court for the District of Columbia in which it required the EPA to develop BAT effluent guidelines by July 1, 1980 for 65 toxic pollutants listed in the decree. The Act also requires the EPA to promulgate pretreatment standards for indirect dischar-gers based on BAT or more stringent criteria. 13
Third, the Act requires the states to establish water-quality criteria and to set ambient quality standards for each of their rivers, subject to EPA approval. This continues the procedures under prior law pursuant to which the states submitted their ambient water standards for federal approval, submitted their own effluent limitations designed to meet these standards, and had responsibility for enforcement of the limitations. 14
To monitor compliance with the pollutant effluent limitations, the Act establishes a system for issuing pollution permits called the National Pollutant Discharge Elimination System (NPDES). 15 Each discharger, including POTWs, must obtain a permit from the EPA. No permit may be issued unless the effluent to be discharged meets federal effluent standards. 16
As Professor Frank P. Grad has noted in his Treatise on Environmental Law, these four “regulatory schemes ... are limited ... by a variety of general provisions dealing with enforcement, citizen suit, judicial review, and the like.” 17
Congress again amended portions of the Act in 1987 to extend the compliance dates prescribed in the 1977 Act from July 1, 1984, to March 31, 1989; to permit modification of effluent limitations for certain specified “nonconventional” pollutants; to permit modification of secondary treatment requirements, to alter the guidelines applicable to facilities that are fundamentally different; and to effect other changes. Our references in this opinion to the Act refer to its provisions as finally amended in 1987.
The Act requires direct dischargers to comply with technology-based pollutant-effluent limitations that, in time, will become more stringent. 18 First, it orders all direct dischargers of conventional pollutants to comply with effluent limitations achievable by application of the “best practicable control technology presently available” (BPT) by July 1, 1977. Second, it orders all direct dischargers of conventional pollutants to comply by March 31, 1989 with effluent limitations based on a more exacting standard, the “best conventional pollution control technology” (BCT). It mandates in addition that, by the same date, direct dis-chargers of toxic pollutants must comply with the even more rigorous effluent limitations based on the “best available technology economically achievable” (BAT). 19
The EPA must determine the BPT, BCT, and BAT requirements and announce them in regulations establishing “effluent limitations guidelines” for various classes and categories of dischargers. In establishing each set of standards Congress required the EPA to consider a number of factors including costs, although the cost factor is accorded less weight for facilities not yet constructed and for discharges more harmful to the environment.
New plants constructed after the promulgation of the OCPSF Guidelines that discharge directly into navigable waters are subject to separate standards referred to as “new source performance standards” (NSPS). The new source performance standards are based on the “best available demonstrated control technology ” (BADCT) as identified by the EPA. 20
Indirect dischargers rely on POTWs to treat their wastewaters, and the Act re *197 quires the EPA to set effluent limitations for POTWs engaged in the treatment of municipal sewage or industrial wastewa-ter. 21 Although the POTW requirements are determined by separate regulations, they must be based on BAT to ensure that all final dischargers of toxic pollutants meet the same standards. The treatment usually accorded by POTWs, however, may not remove all pollutants discharged into their facilities by industrial users and their operation of these facilities may be damaged by some industrial discharges. Therefore, to regulate the discharge into POTWs of those pollutants determined “not to be susceptible to treatment” by POTWs or likely to “interfere with the operation” of POTWs, 22 the Act requires the EPA to establish “pretreatment standards for existing sources ” (PSES). These standards must also be based on BAT. 23
The OCPSF limitations are technology-based and apply to plants grouped into categories based on their industrial characteristics. The EPA, with the concurrence of the state affected, may establish special provisions for a facility that is fundamentally different with respect to one or more of the factors relevant in developing the regulations other than cost. These provisions, which are known as “fundamentally different factor” (FDF) variances, are intended to adjust the general limitations and provide different ones for a plant whose individual characteristics prevent it from performing within the limits set for its industrial category. 24 An FDF variance application may be based on supporting data submitted to the EPA during the rulemak-ing process or on information that the applicant did not have a reasonable opportunity to submit at that time. 25
The regulatory process is not static. Various provisions of the Act require the EPA to review the guidelines periodically and to revise them when appropriate. 26
For the past eleven years the EPA has conducted studies and rulemaking proceedings for the purpose of establishing OCPSF pollutant-effluent limitations. The EPA has identified model technologies that in its view satisfy the development criteria for BPT, BAT, NSPS, and PSES. Based on these model technologies, the EPA has determined treatment performances and has established effluent limitations for conventional and toxic pollutants within the range of the performances achieved by the model technologies. The OCPSF limitations provide maximum daily and maximum monthly average limits for the discharge of designated pollutants from each “point source,” that is, each discharge pipe. 27
Standards of Review
The Administrative Procedure Act (APA) fixes the standard for appellate review of agency actions. Agency actions may be set aside only if the “agency action, findings, and conclusions [are] found to be ... arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law”; or “in excess of statutory jurisdiction, authority, or limitations, or short of statutory right”; or “without observance of procedure required by law.” 28 In making its determinations, “the court shall review the whole record or those parts of it cited by a party, and due account shall be taken of the rule of prejudicial error.” 29
The many issues raised on appeal concern three aspects of the EPA’s actions, each governed by different standards: (1) its rulemaking procedures; (2) its interpretation of the Clean Water Act; and (3) the *198 validity of its regulations and its actions to enforce the Act.
The standards of review for each of these types of issues have been stated and restated in a host of cases, not always consistently. The most frequently stated verbal formulae are these:
Review of the validity of the challenged procedure is a question of law governed principally by the APA, under which our review is plenary. In determining validity, the Administrator’s decision is entitled to a presumption of regularity. 30 A party petitioning for review of an agency’s regulations bears the burden of overcoming this presumption. 31
When we turn to the EPA’s interpretation of the statute, our review is again plenary, for we may not accept its interpretation if “contrary to Congress’s intentions as revealed by the Act’s language, structure, and legislative history.” 32 In statutory interpretation, the judiciary is “ ‘the final authority and we must reject administrative constructions which are contrary to clear congressional intent.’ ” 33 Nevertheless, we accord some deference to the Agency’s interpretation of the statute whose enforcement is entrusted to it if Congressional intention is not pellucid. 34 If, therefore, the statute is susceptible to more than one interpretation, we must accept that of the EPA if it is reasonable. 35 We need not find that it is the only permissible interpretation, but merely that the “EPA’s understanding of this very ‘complex statute’ is a sufficiently rational one to preclude a court from substituting its judgment for that of the EPA.” 36 According deference to an agency, however, does not imply “rubber stamping” its decision. 37
In interpreting the Act, we do not lack precedent. The Supreme Court has twice considered issues involving its construction, 38 and eight circuit courts have done so in at least twenty-seven cases. 39
*199 After interpreting the statute according to these principles, we must next determine whether the EPA’s findings or the regulations based on them are “arbitrary or capricious.” In doing so we must conduct a “searching and careful review” of the facts to determine whether “the decision was based on a consideration of the relevant factors and whether there has been a clear error of judgment.” 40 As a reviewing court, however, we must not “substitute [our] judgment for that of the agency,” 41 but must "start with the assumption that the agency’s action is valid.” 42 The court’s proper function is only to determine whether the agency has “considered the relevant factors and articulated a rational correlation between the facts found and the choice made.” 43
An agency rule is “arbitrary” if the agency has “relied on factors which Congress has not intended it to consider, entirely failed to consider an important aspect of the problem, offered an explanation for its decision that runs counter to the evidence before the agency, or is so implausible that it could not be ascribed to a difference in view or the product of agency expertise.” 44
Because “technological and scientific issues such as those presented in [reviewing effluent limitations] are by their very nature difficult to resolve by traditional principles of judicial decisionmaking,” 45 the court “ ‘must look at the [agency’s] decision not as the chemist, biologist or statistician that [it is] qualified neither by training nor experience to be, but as a reviewing court exercising ... certain minimal standards of rationality.’ ” 46
Even with regard to complex technical or scientific decisions, however, a reviewing court may not simply defer to an agency’s expertise, but must “steep” itself in technical matters sufficiently to determine whether the agency “has exercised reasoned discretion.” 47 Because judicial review “must be based on something more *200 than trust and faith in EPA’s experience,” 48 a court may not respond to claims of technical expertise by “rubber stamping” an agency decision as correct. 49
These formulae, however, ultimately may prove to be deceptive guides. The Supreme Court’s decisions seem to embody two different approaches that are, “analytically in conflict ‘with the result that a court of appeals must choose the one it deems more appropriate for the case at hand.’ ” 50 In determining the degree of deference appropriate to an agency’s decision, the factors to be considered include the fact-law dichotomy, despite the difficulty of drawing a precise line between fact and law; 51 whether the question to be decided is one concerning which the courts have a special competence, such as constitutional law, or one that turns on technical expertise of the kind the agency staff possesses; 52 whether the issue turns on the agency’s interpretation of its own authorizing statute, which entitles it at least to guarded deference; 53 and the validity of the reasoning upon which the agency relies to justify its actions. 54
Either the application of these formulae or the balancing of factors praised by scholars leaves the reviewing court with a wide margin for decision. Any approach permits different possible decisions on the various issues. Our duty requires us to resolve them with the good judgment that the latitude afforded the court demands. In performing this duty, we recognize our own limitations in assessing policy decisions. 55
I. Procedural Challenges
1. The EPA’s Economic-Impact Study
The Clean Water Act explicitly requires the EPA to consider economic achievability in formulating pollutant effluent limitations. 56 The Chemical Manufacturers Association (CMA) contends that, in preparing its economic-impact study, the EPA departed from its prior practice during the rule-making proceedings and violated the APA’s notice-and-comment requirement by relying on economic data obtained from Dun & Bradstreet that were never made available to the public for comment.
The APA requires an agency to set forth in its notice of proposed rulemaking “the terms or substance ... or a description of subjects and issues involved” in the proposed rule. 57 The agency must then give interested persons an opportunity to participate in rulemaking through criticism and comments. 58 Although the APA does not specifically require notice and comment on the technical data that an agency considers, this court has recognized that fairness requires that the agency afford inte