OPINION and ORDER
This post-award bid protest case is before the court on the partiesâ corresponding cross-motions for judgment on the administrative record, as well as plaintiffs request for a permanent injunction. Difficult questions pertaining to balancing the level of deference that should be afforded to military decisions with the enforcement of statutory and regulatory procurement laws are addressed herein. In this regard, the parties have raised numerous persuasive and thought provoking arguments which can be categorized into three predominate sections. First, the parties dispute whether the contracting officer
Factual Background
Throughout the opinion, repeated references are made to engine inlet barrier filter (IBF) systems and so-called âA kitsâ and âB kitsâ which comprise the bulk of the system. The Army, defendant, has been on notice for several years, and it is undisputed, that the installation of a filter system significantly reduces damage caused by the ingestion of sand and foreign particles. The Army has twice sought to develop a solution, but both attempts proved unsuccessful. In this context, the IBF is attached to the UH-60 Blackhawk helicopter engine. The UH-60 helicopters to which the filter system will be attached are primarily scheduled to head toward the harsh desert terrain in Iraq. The helicopters being replaced in the combat theater were heavily damaged by the conditions. The âA kitsâ and âB kitsâ will work in tandem to counter the corrosive and deteriorating effects of sand particles. Each helicopter is first fitted with an âA Mt,â which serves a dual purpose: (1) it is the hardware to which the filter system is mounted, and (2) it permits monitoring of the filter system. The âB kitâ is the actual interchangeable filter. The filtration system, therefore, requires both an âA kitâ and a âB kit.â
Pursuant to a previously awarded contract, No. DAAH23-02-C-0006 (Blackhawk Production Contract), Sikorsky Aircraft Company (Sikorsky) is responsible for designing, developing and manufacturing the UH-60 Blackhawk helicopter. On July 23, 2003, under a different contract, Sikorsky was directed to conduct an engine filtration trade study. The trade study contemplated that Sikorsky would evaluate, in addition to two concepts chosen at its discretion, a design concept developed by Aerospace Filtration Systems (AFS), a division of Westar Corporation (Westar). In August 2003, however, the trade study was suspended and Sikorsky was directed to immediately begin incorporating the AFS design.
The parties contest two factual aspects of the August 2003 decision. First, the parties dispute whether Sikorsky was specifically directed to use the AFS design. In this regard, while the December 2003 contract modification does not expressly acknowledge such a requirement, two separate statements in the administrative record lead to an opposite conclusion.
October 2003 proved to be an extremely important month in the context of this procurement. On October 9, 2003, a directive was issued in which the Army concluded that âinstallation of BLACK HAWK main engine barrier filters was required for ... deployment not later than [March 2004] to ensure required readiness in theater.â
The Army invoked the unusual and compelling urgency exception to full and open competition to procure the IBFs.
As these events occurred, antecedent and parallel events giving rise to plaintiffs OCI claim were also taking form. In May 2000, Westar was the recipient of an Omnibus 2000 contract (02K). Under the contractâs Statement of Work, Westar was responsible for performing systems engineering and technical direction (SETA) tasks.
In a report dated May 16, 2003, Westar noted that it had â[pjrepared for and participated in meetings to generate Propulsion-related project ideas. Explored Westar capabilities and problem areas in the Army aircraft fleet to plan future projects.â
Returning to the fall of 2003, the various COsâ actions in response to OCI concerns warrant attention. After the trade study was suspended in August 2003, a CO for the 02K apparently recognized the conflict and sought to implement precautionary measures. The extent of the COâs actions are reflected in the administrative record through two unsigned and unapproved mitigation plans.
On December 15, 2003, the Army executed a contract modification to Sikorskyâs Black-hawk Production Contract and procured, inter alia, 183 âA kitsâ and 150 B kits.
Prior to the December 15, 2003, contract modification being finalized, plaintiff had met with Army officials on several occasions to express its interest in providing IBF systems for the UH-60 Blackhawk helicopter. Despite the inquiries, meetings, phone calls, and emails, its efforts were to no avail. Plaintiff filed suit in this court on December 18, 2003. The court immediately placed the matter on an expedited schedule. After the parties completed their briefings, the court held oral argument on defendantâs motion to dismiss for failure to state a claim upon which relief can be granted. Given the need for an expeditious resolution of the matter, defendant filed the administrative record on January 28, 2004. On February 2, 2004, the court denied defendantâs motion to dismiss reasoning that it could exercise jurisdiction over plaintiffs allegations of procedural violations of CICA as well as OCI regulations. Defendant supplemented the administrative record on February 24, 2004. The parties filed simultaneous cross-motions for judgment on the administrative record on February 26, 2004. The parties filed their responses on March 4, 2004, and their replies on March 11, 2004. The court held oral argument on March 31, 2004.
In the interim, on March 2, 2004, plaintiff filed an amended complaint. In its prayer for relief, plaintiff, in pertinent part, asks the court for: (1) declaratory judgment that the procurement was in contravention of law and regulation; (2) permanent injunction limiting the current procurement to only the minimum amount necessary to satisfy the current emergency situation; (3) permanent injunction directing defendant to procure any amount over the minimum on a competitive basis; (4) permanent injunction preventing defendant or Sikorsky from awarding any subsequent contracts to either Westar or its affiliates for a time period no shorter than the duration of Westarâs current 02K; and (5) permanent injunction precluding AFS from participating in the re-instituted trade study.
Discussion
Motions for judgment on the administrative record are treated in accordance with the rules governing motions for summary judgment. RCFC 56.1; see Nickerson v. United States, 35 Fed.Cl. 581, 588 (1996), aff'd, 113 F.3d 1255 (Fed.Cir.1997). Summary judgment is appropriate when there are no genuine issues of material fact and the moving party is entitled to judgment as a matter of law. RCFC 56(c); Anderson v. Liberty Lobby, Inc., 477 U.S. 242, 247, 106 S.Ct. 2505, 91 L.Ed.2d 202 (1986); Jay v. Secây, DHHS, 998 F.2d 979, 982 (Fed.Cir. 1993). A fact is material if it might significantly affect the outcome of the suit under the governing law. Anderson, 477 U.S. at 248,106 S.Ct. 2505.
The party moving for summary judgment bears the initial burden of demonstrating the absence of any genuine issues of material fact. Celotex Corp. v. Catrett, 477 U.S. 317, 325, 106 S.Ct. 2548, 91 L.Ed.2d 265 (1986). If the moving party demonstrates an absence of a genuine issue of material fact, the burden then shifts to the non-moving party to show that a genuine issue exists. Sweats
The fact that both parties have moved for summary judgment does not relieve the court of its responsibility to determine the appropriateness of summary disposition. Prineville Sawmill Co., Inc. v. United States, 859 F.2d 905, 911 (Fed.Cir.1988) (citing Mingus Constructors, Inc. v. United States, 812 F.2d 1387, 1390 (Fed.Cir.1987)). A cross-motion is a partyâs claim that it alone is entitled to summary judgment. A Olympic Forwarder, Inc. v. United States, 33 Fed.Cl. 514, 518 (1995). It, therefore, does not follow that if one motion is rejected, the other is necessarily supported. Id. Rather, the court must evaluate each partyâs motion on its own merit and resolve all reasonable inferences against the party whose motion is under consideration. Id. (citing Corman v. United States, 26 Cl.Ct. 1011,1014 (1992)).
Congress amended the Tucker Act in 1996 by granting this court jurisdiction to hear post-award bid protest actions. 28 U.S.C. § 1491(b)(4). The court reviews the challenged agency decisions according to the standards set out in the Administrative Procedures Act (APA), 5 U.S.C. § 706. Impresa Construzioni Geom. Domenico Garufi v. United States, 238 F.3d 1324, 1332 (Fed.Cir. 2001) (citations omitted). In particular, the court must determine whether the agencyâs actions were arbitrary, capricious, an abuse of discretion or otherwise not in accordance with the law. 5 U.S.C. § 706(2)(A). A bid award may be set aside, therefore, âif either: (1) the procurement officialâs decision lacked a rational basis; or (2) the procurement procedure involved a violation of regulation or procedure.â Impresa, 238 F.3d at 1332 (citations omitted).
In determining whether the agency has acted arbitrarily and capriciously toward plaintiff, the court must consider four factors. Keco Indus., Inc. v. United States, 203 Ct.Cl. 566, 574, 492 F.2d 1200 (1974). Specifically, the court must determine whether: (1) there was subjective bad faith on the part of the procuring officials; (2) there was a reasonable basis for the procurement decision; (3) the procuring officials abused their discretion; and (4) pertinent statutes and regulations were violated. Id.; see also Aero Corp., S.A. v. United States, 38 Fed.Cl. 739, 749 (1997). There is, however, âno requirement or implication ... that each of the factors must be present in order to establish arbitrary and capricious action by the government.â Prineville, 859 F.2d at 911. The court must also âgive due regard to the interests of national defense and national security and the need for expeditious resolution of the action.â 28 U.S.C. § 1491(b)(3).
When reviewing agency action, the APA requires a âthorough, probing, in-depth reviewâ to determine âwhether the decision was based on a consideration of the relevant factors and whether there has been a clear error of judgment.â Citizens to Preserve Overton Park, Inc. v. Volpe, 401 U.S. 402, 415-16, 91 S.Ct. 814, 28 L.Ed.2d 136 (1971). In examining an agencyâs procurement action, the agency is given wide discretion in the application of procurement regulations. Bellevue Bus Serv., Inc. v. United States, 15 Cl.Ct. 131, 133 (1988); CACI Field Servs., Inc. v. United States, 13 Cl.Ct. 718, 725 (1987), aff'd, 854 F.2d 464 (Fed.Cir.1988). In this regard, the court cannot substitute its judgment for that of the agency, even if reasonable minds could reach differing conclusions. CRC Marine Servs., Inc. v. United States, 41 Fed.Cl. 66, 83 (1998). Indeed, â[t]he court should not substitute its judgment on such matters for that of the agency, but should intervene only when it is clearly determined that the agencyâs determinations were irrational or unreasonable.â Baird Corp. v. United States, 1 Cl.Ct. 662, 664
The âdisappointed bidder bears a âheavy burdenâ of showing that the award decision âhad no rational basis.â â Impresa, 238 F.3d at 1333 (citing Saratoga Dev. Corp. v. United States, 21 F.3d 445, 456 (D.C.Cir. 1994)). When a protestor is asserting a violation of regulation or procedure, âthe disappointed bidder must show a âclear and prejudicial violation of applicable statutes or regulations.â â Id. (citing Kentron Hawaii, Ltd. v. Warner, 480 F.2d 1166, 1169 (D.C.Cir.1973); Latecoere Intâl, Inc. v. United States Depât of Navy, 19 F.3d 1342, 1356 (11th Cir.1994)). Moreover, âto prevail in a protest the protestor must show not only a significant error in the procurement process, but also that the error prejudiced it.â Data Gen. Corp. v. Johnson, 78 F.3d 1556, 1562 (Fed.Cir.1996). To establish prejudice, a protestor must demonstrate that but for the alleged error, there was a substantial chance it would have received the award. Statistical, Inc. v. Christopher, 102 F.3d 1577, 1581 (Fed. Cir.1996).
I. Organizational Conflict of Interest
Plaintiff advances a litany of arguments purporting to demonstrate violations of OCI regulations. Plaintiff maintains that the CO failed to adhere to procedural requirements. Plaintiff asserts that the CO did not take any actions to address the OCI until after plaintiffs counsel brought the issue to her attention. Plaintiff contends that the COâs determination that no significant potential OCI existed was unreasonable. Further, plaintiff avers that the CO cannot abdicate her responsibilities under the Federal Acquisition Regulations (FAR) simply because government personnel represented that the conflict had been addressed through the submission of mitigation plans. In this regard, plaintiff maintains that the mitigation plans were inadequate and that there is no evidence that the mitigation plans were executed. Building upon its argument that a significant OCI existed, plaintiff contends that the CO failed to obtain approval for a mitigation plan from the appropriate personnel.
Defendant asserts that the CO fully complied with her responsibilities under the FAR. Defendant contends that the CO was only required to act before the time of contract award, which she did. Defendant maintains that the CO properly consulted government personnel first in examining a possible conflict. Defendant also avers that because the government personnel had implemented appropriate precautionary measures, the COâs conclusion that no significant conflict of interest existed was reasonable. Further, defendant asserts that once the CO determined that no significant OCI was present, no further action was required on her part.
The responsibility for ascertaining whether an actual or potential conflict of interest exists generally rests with the CO. 48 C.F.R. § 9.504(a). The CO is instructed to â[i]dentify and evaluate potential organizational conflict of interest as early in the acquisition process as possible ----â Id. § 9.504(a)(1) (emphasis added). For assistance in making this determination, the CO âshould obtain the advice of counsel and the assistance of appropriate technical specialists ....ââId. § 9.504(b); see also id. § 9.506(a) (explaining that the CO âfirst should seek the information from within the Government ...â). The CO is not required to take additional steps if there is a determination that no significant conflict exists. Id. § 9.506(b); see also id. § 9.504(d) (âThe [COâs] judgment need be formally documented only when a substantive issue concerning potential [OCIs] exists.â). If the CO determines that a significant potential OCI may be present, however, certain steps must be taken before a solicitation is issued. Id. § 9.506(b). Amongst these steps, the CO must proffer a ârecommended course of action for avoiding, neutralizing, or mitigating the conflictâ to the head of the contracting activity or the chief of the contracting office. Id. § 9.506(b)(1); see also id. § 9.504(c). The conflict must be resolved in the appropriate fashion prior to the contract being awarded. Id. §§ 9.506(d)(3), 9.504(a)(2); see also LeBoeuf Lamb, Greene & MacRae, LLP v. Abraham,
The identification of the OCI in this case did not occur âas early in the acquisition process as possible ____â 48 C.F.R. § 9.504(a)(1). There was no recognition of any conflict in May 2003 when the Army began its discussions with AFS, despite clear signs that AFS was a division of Westar.
The COâs determination that a significant OCI did not exist is contradicted by the record. The CO did properly contact other government personnel to apprise her of the situation. 48 C.F.R. § 9.506(a). Those personnel informed her that they recognized the potential for a conflict of interest.
Plaintiff also maintains that Westar, through AFS, is precluded from providing the IBF kits because Westar provides SETA services under its 02K. Plaintiff contends that Westar possesses an unfair competitive advantage through its access to information not available to other bidders, in particular source selection information. Further, plaintiff avers a significant OCI exists in light of Westarâs vested interest in having AFS supply the IBF kits. Plaintiff also asserts that prejudice is presumed upon a finding of an actual OCI.
Defendant avers that there is no significant OCI because Westar never actually performed any work under either the 02K or the task orders in connection with the UH-60 Blackhawk helicopter or its propulsion system. Relying on the same line of reasoning, defendant argues that an actual OCI did not arise. Defendant also maintains that plaintiffs âunfair competitive advantageâ argument is based on nothing more than speculation and borders on frivolous.
Given the âhighly influential and responsible positionâ of contractors performing systems engineering and technical direction, 48 C.F.R. § 9.505-l(b), the FAR contains the following explicit prohibition:
A contractor that provides systems engineering and technical direction for a system but does not have overall contractual responsibility for its development, its integration, assembly, and checkout, or its production shall not (1) be awarded a contract to supply the system or any of its major*379 components or (2) be a subcontractor or consultant to a supplier of the system or any of its major components.
Id. § 9.505-l(a) (emphasis added); see also Vantage Assocs., Inc. v. United States, 59 Fed.Cl. 1, 10 (2003). Defendant appears to concede that Westar contracted to provide SETA services for the UH-60 propulsion system, but devotes significant attention to arguing that Westar did not perform any work pertaining to IBFs under the 02K. Specifically, defendant maintains that Task Order 23 only enumerates the work that could have been performed and does not enumerate the work that was actually performed. Defendant also submits a declaration that provides that Westar âdid not received [sic] any taskings under their 02K contract task orders to provide any support, analysis, evaluation, development, or any other effort in connection with Engine [IBFs] on the UH-60 Blackhawk aircraft.â
The FAR prohibits a SETA contractor, as either a prime contractor or a subcontractor, from supplying any of the systemâs major components, without regard to whether work was performed as to that particular component. 48 C.F.R. § 9.508(a). The FARâs prohibition is clarified in the following illuminating example: âCompany A agrees to provide systems engineering and technical direction for the Navy on the powerplant for a group of submarines____Company A should not be allowed to supply any powerplant components.â 48 C.F.R. § 9.508(a) (emphasis added). Westar agreed to provide SETA services concerning UH-60 propulsion systems under its 02K.
Plaintiff is, therefore, entitled to benefit from the presumption of harm/prejudice. Id. at 12, 1995 WL 449806, at *11 (citing NKF Engâg, Inc. v. United States, 805 F.2d 372, 376 (Fed.Cir.1986), Compliance Corp. v. United States, 22 Cl.Ct. 193 (1990), aff'd, 960 F.2d 157 (Fed.Cir.1992)); see also Matter of: DZS/Baker LLC, B-281224, 99-1 CPD H 19, at 7, 1999 WL 46706, at *4 (Comp.Gen. Jan.12, 1999) (â[W]e note that there is a presumption of prejudice ... where a conflict of interest, other than a de minimis or insignificant matter is not resolved.â). Although defendant maintains that the presumption can be rebutted through the implementation of adequate safeguards, the argument loses its persuasiveness given the courtâs conclusion concerning Westarâs mitigation plans. While the court does not question the credibility or integrity of Westar to voluntarily comply with the recommended precautionary measures, the court cannot allow an unsigned
Several of plaintiffs remaining contentions deserve attention. First, plaintiff alleges that an OCI exists because of Westarâs vested interest in ensuring that AFS remains a financially sound institution and because of the possibility that Westar obtained information from the Army that was not available to other bidders. Plaintiffs allegations appear to be considerations that would be encompassed within 48 C.F.R. § 9.505-l(a). These concerns would be present in any instance where a contractor is providing SETA services and an affiliate at the same time provides the underlying major component.
Second, the court does not believe that plaintiff has satisfied 48 C.F.R. § 9.505(b)(1)-(2). The United States Court of Appeals for the Federal Circuit (Federal Circuit) has made clear that conflict violations must be established through âhard facts.â CACI, Inc.-Fed. v. United States, 719 F.2d 1567, 1582 (Fed.Cir.1983).
II. Unusual and Compelling Urgency
Plaintiff asserts that defendant improperly invoked CICAâs unusual and compelling urgency exception. Plaintiff maintains that the actual reasons behind the exceptionâs invocation were a lack of advance planning and funding concerns. Plaintiff avers that the J & A does not adequately justify a sole source award to AFS. Further, plaintiff contends that the J & A does not adequately address the harm to the government. Plaintiff also questions the timing of the J & A. In addition, plaintiff asserts that defendant did not ârequest [offers] from as many potential sources as is practicable under the circumstances.â
Defendant asserts that plaintiff conceded in its complaint that there is an urgent need for the filters. Defendant nevertheless maintains that the current emergency was caused by the harsh desert conditions encountered in Operation Iraqi Freedom. Defendant also avers that the J & A was approved in a timely fashion. In addition, defendant contends that the substance of the J & A adequately addresses the need for the filters and the possible harm from any delay in procurement. Defendant also asserts that it was impracticable to seeks offers from other sources given the time constraints and Sikorskyâs qualifications. Defendant maintains that authorization for the procurement of 240 IBF kits is based on an estimate of the number of aircraft to be deployed in the next troop rotation and, therefore, does not exceed the minimum amount necessary to satisfy the current emergency. Defendant also maintains that the full amount of funding for
CICA requires an agency to conduct its procurements through âfull and open competition.â 10 U.S.C. § 2304(a)(1)(A). As with most rules, the mandate is not absolute and is subject to several exceptions. Most pertinent to the present controversy is the unusual and compelling urgency exception. Id. § 2304(c)(2). Specifically, the exception reads as follows:
The head of an agency may use procedures other than competitive procedures only when ... (2) the agencyâs need for the property or services is of such an unusual and compelling urgency that the United States would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits bids or proposals.
Id.; 48 C.F.R. § 6.302-2(a)(2). Noticeably, the provision only allows an agency the option of âlimit[ing] the number of sources;â it does not permit the agency to simply disregard competition. The preference for optimizing competition is further reiterated in § 2304(e), which provides, in pertinent part, that â[t]he head of an agency using procedures other than competitive procedures ... by reason of the application of subsection (c)(2) ... shall request offers from as many potential sources as is practicable under the circumstances.â 10 U.S.C. § 2304(e); 48 C.F.R. §§ 6.301(d), 6.303-2(c)(2); see also Aero Corp. v. Depât of the Navy, 540 F.Supp. 180, 207 (D.D.C.1982). In addition, invocation of the unusual and compelling urgency exception may not be âjustified on the basis of (1) a lack of advance planning by the requiring activity or (2) concerns related to the amount of funds available (e.g., funds will expire) to the agency or activity for the acquisition of supplies or services.â 48 C.F.R. § 6.301(c); 10 U.S.C. § 2304(f)(5).
Several inherent limitations as to scope and duration have also been acknowledged. The court has recognized that âthe agency [must] take reasonable steps to accurately determine its needs and describe them.â Filtration Dev. Co., LLC v. United States, 59 Fed.Cl. 658, 663-64 (2004) (quoting Matter of: Signals & Sys., Inc., B-288107, 2001 CPD 11168, at 12, 2001 WL 1150705, at *9 (Comp.Gen. Sept.21, 2001)). The court also emphasized that âthe urgency justification cannot support the procurement of more than a minimum quantity needed to satisfy the immediate urgent requirement.â Id. In addition, the Comptroller General has held that invocation of the exception âshould not continue for more than a minimum time.â Matter of: Tri-Ex Tower Corp., B-239628, 90-2 CPD 1Ă221, at 5, 1990 WL 278490, at *4 (Comp.Gen. Sept.17,1990).
At the outset, plaintiff indicates in its reply brief that â[n]ever has [plaintiff] questioned that the Army has a need to